1 Work packages are used to:
A Represent units of work at a level where work is performed.
B Clearly distinguish one work package from all others assigned to a single functional group.
C Limit the work to be performed to relatively short periods of time.
D All of the above. 考試大論壇
E A and B only
ans:D
2 Project life cycles are very useful for _____ and _____ .
A Configuration management, termination
B Objective setting, information gathering
C Standardization, control
D Configuration management, weekly status updates
E Approval, termination
ans:C
3 Which of the following are included as part of a scope statement?
A Project justification
B Project deliverables
C Project objectives
D All of the above
E B and C
ans:D
4 The initial document that formally recognizes the existence of a project is the _____ .
A Scope baseline
B Management plan 來源:www.examda.com
C Project charter
D Configuration control report
E None of the above
ans:C
5 Which of the following is not a scope management process?
A Initiation
B Scope planning
C Scope Definition
D Scope change control
E Scope verification
ans:D
6 In which of the following scope management processes is the scope management plan prepared?
A Initiation
B Scope planning
C Scope Definition
D Scope change control
E Scope verification
ans:B
7 The project charter is prepared in which scope management process?
A Initiation
B Scope planning 考試大論壇
C Scope Definition
D Scope change control
E Scope verification
ans:A
8 The work breakdown structure (WBS) is first developed in which scope management process?
A Initiation
B Scope planning
C Scope change control
D Scope Definition
E Scope verification
ans:D
9 In which of the following scope management processes are subject matter experts used?
A Initiation
B Scope planning 來源:www.examda.com
C Scope Definition
D Scope change control
E Scope verification
ans:A
10 A Work Berakdown Structure is most useful for:
A Identifying individual tasks for a project.
B Scheduling the start of tasks.
C Developing a cost estimate.
D Determining potential delays.
E A and C.
ans:E
11 The scope statement provides
A A basis for future decisions about a project.
B A baseline to accomplish verification measures.
C A baseline to evaluate potential scope changes.
D All of the above
E B and C only
ans:D
12 A work breakdown structure:
A assures all work is identified.
B subdivides the project into manageable segments.
C provides the project sponsor with a time-phase task summary.
D both A and B.
E All of the above.
ans:D
- 1項(xiàng)目達(dá)到了質(zhì)量目標(biāo),但用戶的質(zhì)量調(diào)查結(jié)果卻很差
- 2安全工程師電工安全技術(shù)考核試卷(B卷)
- 3挖掘機(jī)安全技術(shù)操作規(guī)程
- 4安全工程師案例分析復(fù)習(xí)要點(diǎn):安全管理
- 52015年咨詢工程師《項(xiàng)目決策分析與評(píng)價(jià)》每日一練4.4
- 6基坑排水采用的形式
- 7工藝設(shè)計(jì)基礎(chǔ)知識(shí)培訓(xùn) 閥門的設(shè)置 45p
- 82015年招標(biāo)師考試法規(guī)與政策:評(píng)標(biāo)委員會(huì)的法律責(zé)任
- 9水、電源和其他動(dòng)力條件調(diào)查內(nèi)容表 蒸汽
- 102015年安全工程師安全生產(chǎn)法:礦山開采安全保障的規(guī)定
- 11涂料裝飾工程質(zhì)量管理對(duì)策 內(nèi)容
- 122013年二級(jí)建造師《法規(guī)》:企業(yè)資質(zhì)等級(jí)許可制度
- 13工程咨詢概論知識(shí)點(diǎn):我國工程咨詢業(yè)的歷史回顧
- 14一級(jí)建造師管理與實(shí)務(wù)復(fù)習(xí)要點(diǎn):液態(tài)水
- 15安全工程師生產(chǎn)法復(fù)習(xí)資料——制定、修訂標(biāo)準(zhǔn)的建議
- 16變形測量點(diǎn)的具體內(nèi)容都有那些
- 17【達(dá)江解惑三】與名師對(duì)話 讓我們一起從平凡走向成功
- 18某園林綠化工程施工組織設(shè)計(jì)47p
- 19[河南]橋梁工程立柱施工工法
- 20斗輪機(jī)施工措施
- 212015年安全工程師《管理知識(shí)》:應(yīng)急預(yù)案的基本結(jié)構(gòu)
- 222015年沈陽安全工程師報(bào)名時(shí)間
- 23具有發(fā)生滑坡條件的斜坡治理方法
- 24二級(jí)建造師考試復(fù)習(xí)總結(jié):施工測量的內(nèi)容和方法
- 25土方路堤填筑施工
- 26燃?xì)夤艿赖脑囼?yàn)方法
- 272015年招標(biāo)師:貨物的價(jià)格特征和需求
- 282015年招標(biāo)師考試答疑:編輯需要做哪些工作?
- 29水電工程管理與實(shí)務(wù):生產(chǎn)安全事故的應(yīng)急救援及調(diào)查處理
- 302010年P(guān)MP美國項(xiàng)目管理考試習(xí)題及答案八
成都公司:成都市成華區(qū)建設(shè)南路160號(hào)1層9號(hào)
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓