礪志PMP模擬題本周精選7
Which statement about customer expectations is not true --
a. The product or service should be usable as intended.
b. Contractual provisions, including schedule and performance standards, should be met.
c. Changes should be made immediately, and all customer wants should be satisfied without bureaucratic hassle
d. The seller should assume the responsibility of understanding customer needs and addressing them effectively.
Qustions 3:
The document that describes the objectives, work content, deliverables, and end product of a project is the--
a. Project charter
b. Product description
c. Scope statement
d. WBS
Qustions 5:
Maintenance is crucially important to projects and should--
a.Be included as an activity to be performed during the closeout phase
b. Have a separate phase in the life cycle in information systems projects because 60% to 70% of life-cycle costs of computer systems are generally devoted to maintenance
c. Not be viewed as part of the project life cycle
d. Always be viewed as a separate project
Qustions 2:
The WBS is an input to scope change control because it--
a. Provides information on project objectives
b. Defines the project’s scope baseline
c. Defines all project baselines
d. Provides information on scope performance
Qustions 4:
When an organization chooses a project selection model, the most important criterion is --
a. Capability
b. Realism
c. Ease of use
d. Cost
Qustions 6:
A project manager’s company operates in a high-technology area requiring the integration and sharing of several functional specialties. The project manager is considering the appropriate organizational structure ofr a new project, the likely choice would be --
a.Matrix
b.Tight matrix
c.Functional
d.Projectized
- 12012一級建造師《公路工程》:路面粒料基層施工技術
- 2連拱隧道實施性施工組織設計109頁(新奧法)
- 3某特大橋高墩翻模安全專項施工方案
- 42015年咨詢工程師《項目決策分析與評價》每日一練4.16
- 52015招標師考試案例分析
- 62015一級建造師《市政工程》講義摘要(12)
- 7一級建造師《工程經(jīng)濟》知識點整理(9)
- 82013年二級建造師《建筑》:鋼筋工程
- 92015年造價員基礎知識:對高強混凝土組成材料的要求
- 10淺談土工膜在混凝土壩缺陷修補中的應用
- 11編制投標書常見的115個錯誤(十一)
- 12四川省2008年度注冊安全工程師執(zhí)業(yè)資格考試報名時間延長至7月2日
- 132015年造價員基礎知識重點輔導:招標投標
- 142015造價員《安裝工程》知識:各工程量清單項目
- 152015招標師《法律法規(guī)與政策》:訴訟時效
- 162015安全工程師《生產(chǎn)管理》模擬題(20)
- 17吐庫二線首個電氣化“心臟”激活 南疆鐵路將進入電氣化時代
- 18京包鐵路集寧至包頭段增建某隧道工程(實施)施工組織設計
- 19國家重點工程滬昆客專江西弋陽特大橋開始架梁
- 202015年造價工程師考試學習計劃表
- 212015年招標師考試招標采購法律法規(guī)與政策輔導講義四
- 222015年安全工程師《事故案例分析》試題(8)
- 232015年招標師《招標采購案例分析》:工程實施事件
- 24礦井雨季防治水技術篇(一)
- 25一級建造師考試精華總結:代理的種類
- 262015年安全工程師安全生產(chǎn)技術練習題(8)
- 27二級建造師《法規(guī)》考點狂背:建設工程施工許可制度
- 28泰國將籌建兩條高鐵 穿過老撾與中國西南部聯(lián)通
- 29造價工程師復習資料:線性盈虧平衡分析的前提條件
- 30現(xiàn)場臨時用水用電布置圖
成都公司:成都市成華區(qū)建設南路160號1層9號
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務大廈18樓