項(xiàng)目管理:PMP模擬題精選3
The change control system includes--
a. Procedures to define how documents may be changed
b. Specific change requests expected on the project and plans to respond to each one
c. Performance reports that forecast project changes
d. A description of the functional and physical characteristics of an item or system
Qustions 3:
Typically, change control systems include automatic approval of certain types of changes. An example of such a change is one that is--
a. Suggested by the project sponsor
b. The result of an emergency
c. Suggested by the customer
d. Made mandatory by a new regulation
Qustions 5:
Rolling wave planning provides information on the work to be done--
a. Throughout all phases of the project
b. For successful completion of the current phases of the project
c. For successful completion of the current phase and subsequent phases of the project
d. In the next phase of the project
Qustions 2:
According to Herzberg’s motivator-hygiene Theory of Motivation, if achievement, recognition, responsibility, advancement or promotion, and positive supervisor attitude are not present, employees will--
a. Become alienated with the organization and leave
b. Lack motivation but will not be dissatisfied with their work
c. Lack motivation and become dissatisfied with their work
d. Become dissatisfied only if they do not receive salary increases
Qustions 4:
Problem solving, which is an important activity on projects, consists of --
a. Influencing the organizations to get things done
b. Defining problems and making decisions
c. Conferring with others to reach a dicision
d. Producing key results expected by stakeholders
Qustions 6:
Configuration management describes procedures to apply technical and administrative direction. Which of the following tasks is not performed in configuration management --
a. Identifying functional and physical characteristics of an item or system
b. Controlling changes to characteristics
c. Performing an audit to verifiy conformance to requierments
d. Allowing automatic approval of changes
- 1某大廈消防施工方案65P
- 2XX公園內(nèi)部園區(qū)道路工程施工組織設(shè)計
- 32015年招標(biāo)師《專業(yè)實(shí)務(wù)》輔導(dǎo):工程管理服務(wù)的需求目標(biāo)
- 4山東“故居里”——園博會威海園完工
- 5福建省2015年造價工程師考試報名時間為6月15日至7月17日
- 6橋梁工程施工工法大全31篇(293頁)
- 72015年招標(biāo)師考前經(jīng)典試題分享(6)
- 82015造價員復(fù)習(xí)資料:建筑安裝工程規(guī)費(fèi)費(fèi)率
- 9某住宅3期消防施工方案24P
- 102015年咨詢工程師考試《咨詢概論》練習(xí)題(22)
- 112012一級建造師《項(xiàng)目管理》:工程職業(yè)健康安全事故的分類
- 122015年一級建造師《建設(shè)工程項(xiàng)目管理》知識摘要(5)
- 13可回收錨桿
- 142015年安全工程師《生產(chǎn)管理知識》試題精選(1)
- 152013年新疆二級建造師重新注冊申請表
- 16度假區(qū)總平面規(guī)劃圖紙
- 17隧道跟管鉆管棚施工法
- 182008年監(jiān)理工程師《監(jiān)理基本理論與相關(guān)法規(guī)》習(xí)題28
- 192015年注冊咨詢工程師《工程咨詢概論》模擬題(37)
- 20注冊消防工程師備考要明確解題思路分析
- 21泰州市2015年安全工程師考試補(bǔ)報名時間為6月3日
- 22工程造價基礎(chǔ)知識:分部分項(xiàng)工程量清單項(xiàng)目的特征描述
- 23項(xiàng)目成本實(shí)施策劃 主要內(nèi)容
- 242015年招標(biāo)師:系統(tǒng)協(xié)調(diào)性和程序連續(xù)性
- 25一級建造師管理與實(shí)務(wù)復(fù)習(xí)要點(diǎn):承載力公式要記嗎?
- 262015咨詢工程師《項(xiàng)目決策分析與評價》模擬題(45)
- 272015年安全工程師《管理知識》:事故應(yīng)急救援的特點(diǎn)
- 282015造價員《土建工程》知識點(diǎn):常用建筑鋼材
- 29感謝各位老師 山東考生順利通過2013年二級建造師考試
- 302015年造價工程師《理論與法規(guī)》輔導(dǎo)講義(7)
成都公司:成都市成華區(qū)建設(shè)南路160號1層9號
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓