QUEST Project management provides organizations with a methodology to:
A Become more efficient and effective in accomplishing goals that cannot be handled well by
the traditional structure
B Manage high risk repetitive work
C Provide clients with multiple points of contact
D Provide guidance in accomplishing repetitive activities
E All of the above
A
QUEST Configuration (baseline) control monitors performance against the
A scope baseline
B original schedule
C original budget
D All of the above.
E None of the above.
A
QUEST A summary WBS is usually developed in the
A Conceptual phase
B implementation phase
C planning phase
D close-out phase
E All of the above phases
A
QUEST A project may be defined as _____
A an integrated approach to managing projects
B a coordinated undertaking of interrelated activities.
C a group of activities directed by a project manger over a life cycle
D an undertaking with a defined starting point and defined objectives
E All of the above.
D
QUEST Approval to proceed is normally made at the end of the _____ phase of a typical project.
A conceptual
B development
C implementation
D execution
E close-out
A
QUEST Lessons learned are most often based upon project historical records. Lessons learned can
be used to:
A See what mistakes others have made
B See how others have solved problems
C Predict trends, highlight problems and identify alternatives
D All of the above
E A and B only
D
QUEST A program can best be described as:
A A grouping of related activities which last two years or more
B The first major subdivision of a project
C A grouping of projects, similar in nature, which support a product or product line and
have no definable end point
D A product line
E Another name for a project
C
QUEST Ensuring that all work is both authorized and funded by contractual documentation is the
responsibility of:
A The project manager
B The functional manager
C The project sponsor
D The client
E All of the above
A
QUEST The project charter is a document designed to tell _____ exactly what the project
entails.
A The project manager
B The project office
C The project team
D The project sponsor
E Anyone associated with the project
E
QUEST Work authorization forms are needed in order to:
A Authorize line organizations to charge against the project
B Establish an audit trail
C Develop a structured methodology for release of funds
D All of the above
E A and C only
D
QUEST The scope baseline/project charter is prepared by the:
A Project manager
B Project manager and project office
C Project manager, project office and functional team
D Project manager, project office, functional team and project sponsor
E Project manager, project sponsor and customer/user
E
QUEST Typical characteristics of a work package include:
A Representation of units of work at a level where work is performed
B Clearly distinguishes one work package from all others assigned to a single functional
group
C Limits the work to be performed to relatively short periods of time
D All of the above
E A and B only
E
QUEST Problems can occur in properly defining a project because:
A Project goals may not be agreeable to all parties
B The plan was "too loose," thus allowing priorities to change
C Low turnover of project personnel
D Too much communication between the client and project personnel
E The project objectives were quantified
A
QUEST In preparing a good project definition, experienced project managers will:
A Concentrate mainly on the end product rather than costs or benefits. These come later.
B Realize that only the "tip of the iceberg" may be showing. As a project manager, you must
get beneath it.
C Understand that a project definition/plan is a dynamic rather than static tool, and thus
subject to change.
D Try to convert objectives into quantifiable terms.
E All of the above
E
QUEST Project life cycles provide a better means of measurement of progress and control. The
four phases of a project are conceptual development, _____, _____, and _____.
A Preliminary planning, detail planning, closeout
B Implementation, reporting, termination
C Development, implementation, termination
D Execution, reporting, finishing
E Implementation, termination, post-audit review
C
QUEST The contractual statement of work (CSOW)
A Must be the same as the proposal statement of work
B Does not identify reporting requirements
C Can be at a different level of detail (i.e. WBS level) than the proposal statement of work
D Identifies the contractor’s organizational structure for the project
E All of the above
C
QUEST Which of the following can result in misinterpretation of the statement of work?
A Using imprecise language (i.e. nearly, approximately)
B Mixing tasks, specifications, special instructions and approvals
C No pattern, structure or chronological order
D Wide variation in the size of tasks or details of work
E All of the above
E
QUEST A project manager believes that modifying the scope of the project may provide added value
for the customer. The project manager should:
A Change the scope baseline
B Prepare a variance report
C Call a meeting of the configuration control board
D Change the project’s objectives
E Postpone the modification until a separate enhancement project is funded after this
project is completed according to the original baseline
E
QUEST The document authorizing functional areas to charge against the project is the:
A Work authorization form
B Scope baseline
C Project charter
D Management plan
E Linear responsibility chart
A
相關(guān)推薦:
2012年pmp考試模擬試題及答案(一)
- 1一級(jí)建造師管理與實(shí)務(wù)復(fù)習(xí)要點(diǎn):補(bǔ)償收縮混凝土
- 2銅陵體育中心主體完工 “牡丹花”展現(xiàn)雄姿
- 3黑龍江:上半年全省農(nóng)村泥草(危)房改造工作進(jìn)展順利
- 4公園景觀工程施工組織設(shè)計(jì)63p
- 5地下管道接口金屬軟連接施工工法
- 6招標(biāo)師職業(yè)水平考試:招標(biāo)采購(gòu)專業(yè)實(shí)務(wù)第八章練習(xí)題2
- 7PMP認(rèn)證考試練習(xí)題及參考答案(四十)
- 8礦山水害及其防治技術(shù)
- 92013年二級(jí)建造師《法規(guī)及相關(guān)知識(shí)》每日一練(11.27)
- 10安全工程師生產(chǎn)法復(fù)習(xí)資料——安排試驗(yàn)驗(yàn)證項(xiàng)目
- 11黃山市2015年度注冊(cè)安全工程師考試報(bào)名時(shí)間為6月7日至13日
- 12高層住宅小區(qū)市政工程(雨污水、消防、給水)室外管網(wǎng)施工組織設(shè)計(jì)60P
- 132015年安全工程師考試《安全法及相關(guān)知識(shí)》習(xí)題6
- 14一級(jí)建造師公路工程管理與實(shí)務(wù):鋼筋間隔綁扎
- 15社區(qū)地下防空洞數(shù)年內(nèi)塌陷36次 領(lǐng)導(dǎo)多次視察仍無(wú)進(jìn)展
- 162012一級(jí)建造師《機(jī)電工程》特種作業(yè)人員管理
- 17工程咨詢概論考點(diǎn):項(xiàng)目后評(píng)價(jià)報(bào)告的基本格式
- 182015年咨詢工程師《工程咨詢概論》每日一練(9.9)
- 19[臺(tái)州市]06年安全工程師考試報(bào)名通知
- 202015年一級(jí)建造師《建設(shè)工程項(xiàng)目管理》知識(shí)摘要(1)
- 212015年咨詢工程師考試《宏觀經(jīng)濟(jì)》模擬題(19)
- 22造價(jià)工程師復(fù)習(xí)資料:用銷售額和銷售單價(jià)表示的盈虧平衡點(diǎn)
- 23工程咨詢概論考試點(diǎn):綜合評(píng)價(jià)法的概念
- 242015年招標(biāo)師考試教材法律法規(guī)高頻考點(diǎn):招投標(biāo)活動(dòng)法規(guī)
- 25溝通“信息孤島”創(chuàng)建ERP系統(tǒng)——關(guān)于開(kāi)發(fā)建筑施工企業(yè)ERP系統(tǒng)的幾點(diǎn)思考
- 262015年咨詢工程師《工程咨詢概論》每日一練1.2
- 272015年咨詢工程師《工程項(xiàng)目組織與管理》每日一練12.25
- 282015年監(jiān)理工程師考試《工程合同管理》模擬題(7)
- 29朝鮮國(guó)際機(jī)場(chǎng)2號(hào)航站樓24小時(shí)施工 預(yù)定10月10日左右建成
- 30中鐵五局西成項(xiàng)目黃家梁隧道明洞成都方向貫通
成都公司:成都市成華區(qū)建設(shè)南路160號(hào)1層9號(hào)
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓