PMP認(rèn)證考試練習(xí)題(十七)(中英文)
申請(qǐng)免費(fèi)試用、咨詢電話:400-8352-114
1. Methods and techniques used to examine cost and technical data are called feasibility studies. The economic aspects of a feasibility study include interest rates, present worth factors, operation costs, depreciation, and .
Capitalization costs
Technical skill requirements
Technology forecasting
Strategic marketing intelligence
用于審核成本和有關(guān)數(shù)據(jù)的方法和技術(shù)被稱為可行性研究. 可行性研究考慮的經(jīng)濟(jì)方面包括利率,現(xiàn)值因素,操作成本, 折舊, 和 .
資本化成本
技術(shù)性技能要求
技術(shù)預(yù)測(cè)
戰(zhàn)略行銷情報(bào)
2. Upon completion of 75% of the project, the original schedule and cost estimate that were submitted at the inception of the project are referred to as the:
Baseline
Budgeted costs
Estimates upon completion costs
Scheduled costs
以完成項(xiàng)目75%為基礎(chǔ),在項(xiàng)目啟動(dòng)時(shí)遞交的最初的進(jìn)度和成本估算被稱為:
基準(zhǔn)計(jì)劃書
預(yù)算成本
完工成本估算
安排計(jì)劃成本
3. A project manager is trying to better manage the cost of the projects taking place within the Information Technology business unit. Which of the following generic life cycle phases would allow the project manager to have the most impact on managing cost?
Closeout
Execution
Installation
Concept and Design
對(duì)于發(fā)生在信息技術(shù)事業(yè)部的項(xiàng)目成本,某項(xiàng)目經(jīng)理正試圖較好地加以管理. 下列哪一生命周期階段使項(xiàng)目經(jīng)理對(duì)于管理成本有最大的影響?
收尾
實(shí)施
安裝
構(gòu)思和設(shè)計(jì)
4. The methods and techniques for determining the economic costs, the environmental impact, the economic returns, and the probability for success are called:
Feasibility studies
Bills of materials
PERT charts
Management reserve
用于決定經(jīng)濟(jì)成本, 環(huán)境影響, 經(jīng)濟(jì)回報(bào)和成功概率的方法和技術(shù),被稱為:
可行性研究
材料單
計(jì)劃評(píng)審技術(shù)PERT圖
管理儲(chǔ)備
5. “Rolling wave” or “moving window” planning provides the project team with
An immediate detailed description of the work in each project life cycle phase
A highly developed WBS
A preliminary description of work to be done in later phases
A method for quality control
"滾動(dòng)波 " 或 " 移動(dòng)窗" 規(guī)劃提供給項(xiàng)目團(tuán)隊(duì)
在每個(gè)項(xiàng)目生命周期階段中, 一個(gè)即時(shí)詳細(xì)的工作描述
制定了很好的工作分解結(jié)構(gòu)WBS
對(duì)項(xiàng)目后期要做的工作的初步描述
質(zhì)量控制方法
6. The project manager and project team utilize to provide additional control and measurement of contract performance and to describe the work performed by a group or work center.
Work packages
Tasks
Code of accounts
Integration points
項(xiàng)目經(jīng)理和團(tuán)隊(duì)利用 來對(duì)合同績(jī)效提供額外的控制和衡量, 并且描述要由工作團(tuán)隊(duì)或工作中心來做的工作.
工作包
工作任務(wù)
賬戶碼
整合點(diǎn)
7. The roles of the Sponsor or senior management in the planning process include all of the following, except:
Priority setting
Policies and procedures
Key staffing decisions
Scope baseline development
在規(guī)劃過程中, 業(yè)主或高層管理的角色作用包括所有下列事項(xiàng),除了:
優(yōu)先權(quán)的設(shè)定
政策和方式程序
關(guān)鍵的人員配置決策
范圍基準(zhǔn)計(jì)劃的制定
- 12015招標(biāo)師考試項(xiàng)目管理考點(diǎn):合同的索賠管理
- 2水泥穩(wěn)定砂基層路拌法施工
- 3工程招標(biāo)投標(biāo)與合同管理考試題1
- 42015年監(jiān)理工程師《建設(shè)工程合同管理》練習(xí)題(4)
- 5建設(shè)工程風(fēng)險(xiǎn)中,均包含第三者責(zé)任風(fēng)險(xiǎn)損失的是什么
- 62015年安全工程師《管理知識(shí)》:事故應(yīng)急管理的過程
- 7某仿古工程施工組織設(shè)計(jì)66p
- 8攪拌車音響保養(yǎng)
- 9山東:今年公路建設(shè)將投資402億元
- 10一級(jí)建造師管理與實(shí)務(wù)復(fù)習(xí)要點(diǎn):疏浚
- 112015年吉林造價(jià)工程師準(zhǔn)考證打印時(shí)間
- 12招標(biāo)師解析:招標(biāo)的范圍
- 13《政策與發(fā)展規(guī)劃》知識(shí)點(diǎn):期貨交易的分類
- 142008年監(jiān)理工程師《監(jiān)理基本理論與相關(guān)法規(guī)》習(xí)題4
- 15鉆孔樁斜樁施工工法
- 16【經(jīng)驗(yàn)之談】2015年二級(jí)建造師考試備考四個(gè)注意事項(xiàng)
- 17[重慶]辦公樓項(xiàng)目施工階段平面布置圖
- 18水利水電項(xiàng)目的景觀環(huán)境影響評(píng)價(jià)
- 192015年招標(biāo)師考試《法律法規(guī)與政策》復(fù)習(xí)資料:第二章2
- 202013年二級(jí)建造師《施工管理》每日一練(12.16)
- 212015年咨詢工程師《咨詢概論》考試講義33
- 222015年招標(biāo)師《招標(biāo)采購(gòu)專業(yè)實(shí)務(wù)》知識(shí)點(diǎn)整理:第三章2
- 23造價(jià)工程師考試輔導(dǎo)資料:機(jī)械設(shè)備及其分類
- 242015一級(jí)建造師《建筑工程》章節(jié)提要(15)
- 25某軌道交通機(jī)場(chǎng)線(墩柱的施工工法、預(yù)應(yīng)力張拉施工、模板排架安全性計(jì)算)
- 26助理項(xiàng)目管理師CAPM三級(jí)考試習(xí)題二
- 27冷水江市某大型電力工程平面布置圖匯編
- 28建設(shè)單位申請(qǐng)領(lǐng)取施工許可證應(yīng)當(dāng)具備的條件包括
- 292015年招標(biāo)師《招標(biāo)采購(gòu)案例分析》辨析性問題(2)
- 30[福建省]06年安全工程師考試報(bào)名簡(jiǎn)章
成都公司:成都市成華區(qū)建設(shè)南路160號(hào)1層9號(hào)
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓