PMP美國(guó)項(xiàng)目管理認(rèn)證模擬練習(xí)題(8)
申請(qǐng)免費(fèi)試用、咨詢(xún)電話(huà):400-8352-114
PMP美國(guó)項(xiàng)目管理認(rèn)證模擬練習(xí)題(8)
1. Currency fluctuations, political instability, and competition from national and regional governments and special interest groups can interfere with project management of international projects. Project managers for international projects should recognize the primary factors in cross-cultural settings and place special emphasis on
A. Establishing a performance reporting system
B. Developing a system to manage communications
C. Establishing and following a production schedule for information distribution to avoid responding to requests for in formation between scheduled communications
D. Using translation services for formal, written project reports
1. 幣值波動(dòng)、政治動(dòng)蕩、中央和地方政府之間的競(jìng)爭(zhēng),以及不同利益集團(tuán)之間的沖突會(huì)干擾國(guó)際項(xiàng)目的管理。管理國(guó)際項(xiàng)目的項(xiàng)目經(jīng)理應(yīng)該意識(shí)到跨文化環(huán)境的主要影響因素,并特別重視:
A. 建立績(jī)效報(bào)告制度
B. 建立溝通管理系統(tǒng)
C. 建立和執(zhí)行產(chǎn)生進(jìn)度表以方便信息分配,避免在定期會(huì)面之間出現(xiàn)情況的變化
D. 通過(guò)翻譯服務(wù)起草正式的報(bào)告
2. You are working to close out your project. During these hectic final days of the project most conflict arises form-
A. Schedule problems
B. Cost overruns
C. Technical problems
D. Lack of customer acceptance
2. 你目前正忙著做項(xiàng)目的收尾工作。在令人興奮的最后階段,在下列哪個(gè)方面最容易引發(fā)沖突
A. 進(jìn)度問(wèn)題
B. 成本超支
C. 技術(shù)問(wèn)題
D. 缺乏客戶(hù)的認(rèn)同
3. A person estimates that a commute will most likely take I hour. On further questioning, she estimates that the trip could take as little as 45 minutes, best case, or as long as I hour 45minutes, worst case, what is the standard deviation based on the estimates?
A. 10 minutes
B. 15minutes
C. 50 minutes
D. 60 minutes
3. 一個(gè)人估計(jì)她回家最可能的情況是花1小時(shí)間。她又進(jìn)一步推算,在最快情況下要45分鐘,最慢要1小時(shí)45分鐘。基于這樣的估計(jì),這個(gè)人回家所花的時(shí)間的標(biāo)準(zhǔn)差是多少
A. 10分鐘
B. 15分鐘
C. 50分鐘
D. 60分鐘
4. Projects are particularly susceptible to risk because
A. Murphy’s law stated that “if something can go wrong, it will’”
B. Each project is unique in some measure
C. Project management tools are generally unavailable at the project team level
D. There are never enough resources to do the job
4. 由于以下哪個(gè)原因,項(xiàng)目特別容易受到風(fēng)險(xiǎn)的影響:
A. 墨菲定律表明:“如果可能會(huì)生問(wèn)題,問(wèn)題將會(huì)出現(xiàn)”
B. 每個(gè)項(xiàng)目在某些方面是獨(dú)特的
C. 項(xiàng)目管理工具對(duì)于項(xiàng)目小組是不可得的
D. 完成工作的資源永遠(yuǎn)是不足的
答案:B
項(xiàng)目的特征-獨(dú)特的產(chǎn)品、服務(wù)或成果:
關(guān)于項(xiàng)目的特征——獨(dú)特性”
5. What doctrine causes a party to relinquish rights under a contract because it knowingly fails to execute those rights?
A. Assignment of claims
B. Matebal breach
C. Waiver
D. Warranties
5. 根據(jù)什么理論,使得當(dāng)事一方由于有意不實(shí)施合同權(quán)利而放棄一個(gè)合同下的權(quán)利?
A. 權(quán)利轉(zhuǎn)讓
B. 嚴(yán)重違約
C. 自動(dòng)棄權(quán)
D. 授權(quán)
試題推薦:
PMP認(rèn)證考試最新練習(xí)題及參考答案(1-10套)
PMP認(rèn)證考試最新練習(xí)題及參考答案(11-20套)
PMP認(rèn)證考試最新練習(xí)題及參考答案(21-40套)
PMP認(rèn)證考試最新練習(xí)題及參考答案(41-56套)
- 1綠地綠化工程施工組織設(shè)計(jì)
- 22013年二級(jí)建造師《施工管理》每日一練(1.8)
- 3佛肇城際軌道GZZH-2標(biāo)跨321國(guó)道主跨連續(xù)梁順利合龍
- 4造價(jià)工程師復(fù)習(xí)資料:經(jīng)營(yíng)者不得有的不正當(dāng)價(jià)格行為
- 5給水管壓力試驗(yàn)要回填50CM嗎
- 62015.4.8咨詢(xún)工程師每日一練免費(fèi)在線(xiàn)測(cè)試
- 7摩擦樁和端承樁的區(qū)別
- 8北京:房?jī)r(jià)“跳水”被夸大的 三座大山推動(dòng)房企
- 92015年一級(jí)建造師輔導(dǎo)資料:機(jī)電工程竣工財(cái)務(wù)決算
- 10拉日鐵路盆因拉隧道勝利突破萬(wàn)米大關(guān)
- 11影響滑坡活動(dòng)強(qiáng)度的主要因素
- 122015年招標(biāo)師《項(xiàng)目管理與招標(biāo)采購(gòu)》輔導(dǎo)講義(19)
- 13雙壁鋼圍堰施工
- 142015年安全工程師生產(chǎn)技術(shù)模擬練習(xí)(11)
- 15一級(jí)注冊(cè)建造工程師建筑工程管理與實(shí)務(wù):檢查評(píng)分表缺項(xiàng)
- 16建筑設(shè)計(jì)防火相關(guān)術(shù)語(yǔ)
- 172015年招標(biāo)師考試:招標(biāo)實(shí)務(wù)問(wèn)答(27)
- 182006年全國(guó)注冊(cè)安全工程師執(zhí)業(yè)資格考試考生須知
- 19混凝土泵首次使用前的調(diào)試
- 20淺談五金鎖具現(xiàn)狀及發(fā)展
- 212015年招標(biāo)師全真模擬試題3
- 22北京對(duì)違建“一拆到底” 四大利器發(fā)揮作用
- 232015年咨詢(xún)工程師《工程咨詢(xún)概論》每日一練1.5
- 24《工程咨詢(xún)概論》知識(shí)點(diǎn)系統(tǒng)分析內(nèi)容:系統(tǒng)評(píng)價(jià)
- 252015造價(jià)員《安裝工程》熱力安裝:爐底及煙道的鋪砌
- 262015年杭州招標(biāo)師考試的培訓(xùn)
- 27某天然氣乙炔項(xiàng)目給排水施工組織設(shè)計(jì)64P
- 28淮南:潘集區(qū)“四個(gè)推進(jìn)”著力做好農(nóng)村農(nóng)房建設(shè)改造
- 29原平車(chē)務(wù)段忻州站客票機(jī)房施工順利完成
- 302015年安全工程師考試《安全生產(chǎn)管理知識(shí)》練習(xí)題(29)
成都公司:成都市成華區(qū)建設(shè)南路160號(hào)1層9號(hào)
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓