當(dāng)前位置:工程項(xiàng)目OA系統(tǒng) > 建筑OA系統(tǒng) > 軟件項(xiàng)目管理工具
PMP認(rèn)證考試練習(xí)題及參考答案(五十三)
申請(qǐng)免費(fèi)試用、咨詢電話:400-8352-114
1 Monte Carlo simulation:A Was originally developed by Dr. Carlo
B Is a European technique for assessing project risks
C assumes the future risk events will occur at random according to predetermined probability distributions
D is a technique to stimulate create risk event resolution
E A, B and C only
ans:C
2 Which of the following actions is an example of risk response:
A adjust project parameters (scope, time, quality ...)
B reduce the probability of potential project risk events
C reduce the consequences of potential project risk events
D wait until a problem actually happens, then deal with it in the most effective and efficient manner.
E A, B and C only
ans:E
3 Total project risk can be defined as:
A the sum of the probabilities of project risks events times the sum of consequences of those risks
B the sum of the products of each project risk event times its consequences
C the sum of the consequences of all project risk events
D the sum of the probabilities of all project risk events
E 1 - the sum of the probabilities of all project risk events. 來源:考試大
ans:B
4 The utility of a risk seeker is:
A negatively exponential
B positively skewed
C increasing
D decreasing
E symmetrical
ans:C
5 Giving a part of project work to a contractor is an example of:
A risk mitigation
B risk assignment
C risk delegation
D risk deflection
E risk assumption
ans:D
6 Risk management methodology should be adhered to in:
A construction projects
B system projects
C complex projects
D large projects
E All of the above.
ans:E
7 Which of the following activities can be considered as part of risk mitigation
A risk identification
B purchasing insurance
C assessment of outcomes
D assessment of probabilities
E C and D only
ans:B
8 Which of the following scheduling methods uses more of the risk management concepts:
A ADM
B PDM
C CPM
D PERT
E Gantt
ans:D
9 Which of the following utility functions reflects risk-aversion:
A uniform
B increasing
C decreasing
D exponential
E B and D only
ans:C
10 To calculate the expected value of an outcome:
A divide the value of each outcome by its probability, then add the results.
B divide the value of the desired outcome by the value all possible outcomes
C multiply the value of each outcome by its probability, then add the results
D use linear regression to assess the expected value of the outcome
E B and D only 來源:考試大
ans:C
11 Which of the following is most closely associated with pure risk:
A profit and loss
B personnel turnover
C insurance
D market fluctuations
E A and D only
ans:C
12 Which of the following is most closely associated with business risk:
A profit and loss
B personnel turnover
C workmen's compensation
D liability insurance
E All of the above.
ans:A
- 12012年一級(jí)建造師《建設(shè)工程項(xiàng)目管理》知識(shí)點(diǎn)總結(jié):分部工程質(zhì)量驗(yàn)收
- 22015二級(jí)建造師《建筑工程》輔導(dǎo):荷載的分類
- 3范圍管理:需求管理與范圍管理的差異性分析
- 4福建省城市綠地建設(shè)導(dǎo)則(試 行)
- 5[寧夏]2008年度注冊(cè)安全工程師執(zhí)業(yè)資格考試4月28日至5月16日?qǐng)?bào)名
- 62015年注冊(cè)咨詢工程師《工程咨詢概論》習(xí)題(9)
- 7某駁岸圍堰專項(xiàng)施工方案
- 8江西多重措施強(qiáng)化村鎮(zhèn)規(guī)劃龍頭地位
- 9注冊(cè)消防工程師資格考試要考哪些科目?
- 10二級(jí)建造師法規(guī)知識(shí)點(diǎn):建造師執(zhí)業(yè)的范圍
- 11一級(jí)建造師管理與實(shí)務(wù)復(fù)習(xí)要點(diǎn):填筑壓實(shí)標(biāo)準(zhǔn)
- 12觀測點(diǎn)高程或坐標(biāo)中誤差后應(yīng)確定哪些原則?
- 13某高速公路軟基處理施工方法
- 14工程造價(jià)基礎(chǔ)知識(shí):概算的審查和批準(zhǔn)
- 15工程造價(jià)基礎(chǔ)知識(shí)合同概述:合同的成立
- 16新建鐵路溫福線某隧道(實(shí)施)施工組織設(shè)計(jì)
- 172015年安全工程師考試《管理知識(shí)》模擬題(45)
- 1806年大連市招標(biāo)代理機(jī)構(gòu)從業(yè)人員考試單選題及答案3
- 19國家重點(diǎn)工程滬昆客專江西弋陽特大橋架梁完工
- 20橋梁高墩柱輥模施工工法38頁(創(chuàng)新成果一等獎(jiǎng))
- 21二級(jí)建造師考試《法規(guī)》解題技巧:主體型考點(diǎn)
- 22基坑支護(hù)形式之水泥土擋墻
- 23安全工程師輔導(dǎo)資料:電器倒閘操作確保人身設(shè)備安全3
- 24節(jié)段拼裝橋梁部分長線法預(yù)制施工工法
- 252013年四川二級(jí)建造師變更注冊(cè)申請(qǐng)表
- 26自衛(wèi)村水庫見底 6000村民吃水難
- 272015年咨詢工程師考試《方法與實(shí)務(wù)》考點(diǎn):靜態(tài)分析
- 28二建復(fù)習(xí)資料預(yù)埋件的施工方法
- 29框架結(jié)構(gòu)與磚混結(jié)構(gòu)的區(qū)別
- 30武廣客運(yùn)專線某長大隧道實(shí)施性施工組織設(shè)計(jì)
成都公司:成都市成華區(qū)建設(shè)南路160號(hào)1層9號(hào)
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓