當前位置:工程項目OA系統(tǒng) > 建筑OA系統(tǒng) > 軟件項目管理工具
PMP認證考試練習題及參考答案(十)
1. a contractor estimates that a project has a 0.5 probability of $200,000 profit and 0.3 probability of $50,000 loss. the expected monetary value
of this project is:
a. 200000
b. 150000
c. 85000來源:考試大
d. 50000
e. none of the above.
ans: c
2. a project manager who allows the team to make the majority of the decisions is demonstrating a(n) ____ leadership style.
a. laissez-faire
b. boss-centered
c. subordinate centered
d. autocratic
e. demographic
ans: c
3. historical records during close-out are useful to _____ and _____ for future projects.
a. predict trends, highlight problems.
b. analyze successes, shortfalls.
c. analyze strengths, document results.來源:www.examda.com
d. support litigation, defend claims.
e. justify results, set standards.
ans: a
4. in a fishbone diagram, the effect you are concerned about is placed:
a. at the right-hand end of the spine.
b. at the end of the diagonal line (i.e. "fin").
c. on a branch of a fin.
d. at the left-hand end of the spine.
e. none of the above.
ans: a
5. sound, prudent, but often unsophisticated judgement is called:
a. common sense
b. rational management
c. smoothing
d. confrontation
e. none of the above
ans: a
6. which of the following types of specifications gives measurable capabilities of the product:
a. functional specifications
b. performance specifications
c. conformance specificationshttp://ks.examda.com
d. technical specifications
e. process capability specification
ans: b
7. a graphical display of accumulated costs and labor hours for both budgeted and actual costs, plotted against time, is called a(n) _____.
a. trend line.
b. trend analysis.
c. s curve.
d. percent completion report.
e. earned value report.
ans: c
8. by using project risk management techniques, project managers can develop strategies that do all but which of the following:
a. significantly reduce project risks
b. eliminate project risks
c. provide a rational basis for better decision making
d. identify risks, their impact(s), and any appropriate responses
e. none of the above.
ans: b
9. in a flowchart, the diamond form is used to represent:
a. a starting point.
b. an operation.
c. a written report.
d. a decision point.
e. an end point.
ans: d
10. in small companies, project managers and line managers are:
a. never the same person
b. always the same person
c. sometimes the same person
d. always in disagreement with each other
e. forced to act as their own sponsors
ans: c
11. make or buy decisions are usually made during the _____ phase of a project.
a. conceptual
b. development.
c. implementationwww.Examda.CoM
d. execution
e. close-out
ans: b
12. managers who adopt a sound, but prudent managerial style are called
a. authorization
b. conciliatory
c. ethical
d. judicial
e. promotional
ans: d
- 1政府采購招標的程序與技巧
- 2宏觀經(jīng)濟政策與發(fā)展規(guī)劃考點:我國政府采購制度的概念以及基本內(nèi)容
- 32015年招標師《項目管理與招標采購》課件(11)
- 42015年招標師《招標采購法律法規(guī)與政策》試題(9)
- 5造價工程師復(fù)習資料:概算定額與預(yù)算定額的相同點和差異
- 62004年度監(jiān)理工程師執(zhí)業(yè)資格考試應(yīng)試分析
- 7高速公路防撞護欄施工
- 82015年二級建造師《建筑》:內(nèi)腳手架
- 92015招標師《招標采購項目管理》知識點整理2
- 10鉆孔過程出現(xiàn)的掉鉆落物問題
- 11安全工程師安全生產(chǎn)法復(fù)習資料——申請行政復(fù)議或者提起行政訴訟
- 12安全工程師答疑精華:產(chǎn)生靜電的最大危險
- 132012年pmp模擬試題及答案(九)
- 14[廣西]07安全工程師考試4.27起報名
- 15達陜高速公路某隧道施工組織設(shè)計(分離式隧道)
- 16[云南?。?005造價工程師5月9至5月27報名
- 17洞頭縣連港環(huán)島公路長坑隧道工程某標段(投標)施工組織設(shè)計
- 18安全工程師考試《安全生產(chǎn)管理》第二講講義精選(3)
- 19啟動2009年度招標師再登記工作通知
- 202015年咨詢工程師考試《工程咨詢概論》考前練習題(3)
- 21基坑支護形式之土釘墻支護
- 222015年招標師考試《項目管理與招標采購》課件(14)
- 23安全工程師相關(guān)法律知識復(fù)習要點:安全生產(chǎn)法律體系
- 24碳纖維結(jié)構(gòu)補強施工工法與檢驗方法
- 25廣西開展全區(qū)農(nóng)村危房改造資金專項整治行動
- 26【招標采購專業(yè)實務(wù)】第一章考點:采購目標的實現(xiàn)
- 27[陜西]整體式連拱隧道施工組織設(shè)計
- 28混凝土攪拌輸送車操作安全技術(shù)
- 29安全工程師考試《安全生產(chǎn)管理》第五講講義精選(3)
- 30黃強:地基工程方向BIM技術(shù)前景廣闊
成都公司:成都市成華區(qū)建設(shè)南路160號1層9號
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓