PMP認證考試練習題及參考答案(七)
1. which of the following is associated with a buyer's request for material to meet a particular need:
a. material warranty
b. material guarantees
c. implied warranty of salability
d. implied warranty of fitness for a particular purpose
e. a and c onlywww.Examda.CoM
ans: d
2. a project manager trying to communicate accurately to the team should use:
a. the language of the team members
b. the language of the project manager
c. non-verbal methods
d. written memos
e. all of the above.
ans: a
3. an advertiser who uses a movie or sports star to endorse a product is trying to use power.
a. expert
b. legitimate
c. reward
d. influential
e. referent
ans: e來源:考試大
4. control chart theory is based on the differentiation of the causes of variations in quality. variations may be produced by assignable causes.
all of the following are examples of assignable causes except:
a. differences among machines.
b. differences among workers.
c. differences among materials.
d. differences in each of these factors over time.
e. none of the above (all are examples)
ans: e
5. giving a part of project work to a contractor is an example of:
a. risk mitigation
b. risk assignment
c. risk delegation
d. risk deflection
e. risk assumption來源:www.examda.com
ans: d
6. proper implementation of project management will guarantee that:
a. budgets will be met.
b. schedules will be adhered to.
c. quality/performance will be met.
d. the project will be a success.
e. none of the above.
ans: e
7. the most effective means of determining the cost of a project is to price out the _____.
a. work breakdown structure.
b. linear responsibility chart.
c. project charter.
d. scope statement.
e. management plan.
ans: a
8. which method shown below is acceptable for reducing cost or shortening the schedule?
a. "crashing"
b. changing scope.
c. performing activities in parallel rather than in series.
d. all of the above.
e. a and c only.考試大(www.Examda。com)
ans: d
9. which of the following terms is used to describe the receipt issued by a carrier for items to be delivered to a third party:
a. free on board
b. receipt for merchandise
c. packaging list
d. loading list
e. bill of lading
ans: e
10. a computer tape which contains historical project information is called ____ tape.
a. database
b. baseline.
c. archive.
d. lessons learned.
e. life cycle summary.
ans: c
11. according to herzberg, which of the following is a motivational factor?
a. pay
b. hygiene needs
c. achievementwww.Examda.CoM
d. working conditions
e. vacation time
ans: c
12. communication in both project and non-project-driven organizations should occur in directions.
a. one
b. two
c. three
d. four
e. five
ans: e
- 1特種燃磷爐采取的安全措施
- 2咨詢工程師考試《宏觀經(jīng)濟政策與發(fā)展規(guī)劃》自測題(29)
- 32015造價員《土建工程》知識:工程上常用的投影圖
- 4二級建造師法規(guī)知識點:聯(lián)合體投標應當簽訂協(xié)議
- 5一級建造師建設工程法規(guī)及相關知識:買貨方違約
- 62015年安全工程師相關法律知識練習(10)
- 72015造價員考試基礎知識:方案比選方法與造價控制
- 82015年二級建造師《建筑》:模板工程安全檢查評分表
- 9現(xiàn)代咨詢方法與實務考點:效果計量單位的選擇
- 10上海某體育中心工程地下室外墻防水施工方案(QBZ-F涂料)
- 11招標師職業(yè)水平考試:項目管理與招標采購第二章練習題39
- 122015年咨詢工程師《宏觀經(jīng)濟政策與發(fā)展規(guī)劃》每日一練4.2
- 132015年咨詢工程師《工程項目組織與管理》每日一練7.30
- 14蓋瓦(粘土瓦)屋面施工安全要求
- 152006年備考監(jiān)理工程師技巧準則
- 162015年一級建造師《公路工程》路面工程施工(10)
- 172007年安全工程師考試報名信息匯總(密切關注……)
- 182015年咨詢工程師《工程項目組織與管理》每日一練2.27
- 193M升層混凝土施工技術在三峽工程中的應用
- 202015造價員復習資料:甲級工程造價咨詢企業(yè)資質(zhì)標準
- 21河北省關于補辦2015年注冊造價工程師繼續(xù)教育的通知
- 22西南最大轉(zhuǎn)體橋梁完成84度華麗轉(zhuǎn)身 跨越遂成鐵路
- 23招標公證的方式和程序
- 242015年安全工程師安全生產(chǎn)技術練習題(4)
- 25某四層綜合樓消防系統(tǒng)工程施工組織設計
- 26黑龍江2015年安全工程師考試補報名時間為6月24日至26日
- 272015年青海造價工程師報名時間為7月2日-7月11日
- 28零基礎上班族2015年如何在短暫時間內(nèi)備考招標師考試
- 29一級建造師《建設工程經(jīng)濟》重點解析(16)
- 30為什么要進行鋼筋下料長度的計算
成都公司:成都市成華區(qū)建設南路160號1層9號
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務大廈18樓