2010年P(guān)MP美國項目管理考試習題及答案六十八
QUEST The majority of product defects could be prevented in most processes if manufactures would do the following:
A Increase the use of acceptance control charts instead of standard three-sigma control charts.
B Make a concerted effort to eliminate the potential for product defects in the design stage.
C Create a quality control department.
D A and B.
E A and C
參考答案:B
QUEST In the project environment, the individual ultimately responsible for quality control is:
A The line workers who must strive "to do things right the first time" to avoid quality problems.
B the company's quality control manager who must work with the project members to ensure the quality control program is effective.
C The head of the production department who retains ultimate quality control responsibility for all the company's projects.
D The project manager who has ultimate responsibility for the entire project.
E the customer who must ensure that he is receiving a quality product from the vendor.
參考答案:D
QUEST Financial compensation is the primary motivational tool for which of the following management theories of programs.
A Zero-defects program.
B theory X management.
C theory Y management.
D Quality control circles.
E A and C
參考答案:B
QUEST The Pareto Principle is a technique used to determine which quality control problems in a particular process should be corrected. Which of the following statements best represents the philosophy employed by this principle?
A In order to minimize financial losses from quality control problems, all problems which have a measureable cost should be corrected
B the majority of defects are caused by a small percentage of the identifiable problems. Improvement efforts should be reserved for these vital problems.
C in order to achieve zero defects, all quality control problems, including those which do not have a direct financial cost should be corrected.
D generally, 80% of the quality control problems are justifiable for correction via cost-benefit analysis. The remaining 20% are not financially worthy of improvement efforts.
E A and D
參考答案:B
QUEST Most quality problems:
A originate in the quality department where the ultimate responsibility for quality rests.
B originate on the shop floor because of waste and product rework.
C are the results of management inattention to potential quality improvement ideas.
D could be eliminated if shop supervisors monitored their work more closely.
E A and B
參考答案:C
相關(guān)試題:
2010年P(guān)MP美國項目管理考試習題及答案六十七
試題推薦:
2010年P(guān)MP美國項目管理認定考試全真模擬試題精選1
2010年P(guān)MP美國項目管理認定考試全真模擬試題精選2
2010年P(guān)MP美國項目管理認定考試全真模擬試題精選3
- 1安全工程師資料
- 22015年造價工程師考試(安裝)知識精講(9)
- 32012一級建造師《項目管理》:文明施工和環(huán)境保護
- 4越南松邦4水電站順利實現(xiàn)大壩下閘蓄水
- 52015年注冊咨詢師《項目決策分析與評價》最新模擬試題(9)
- 62015年咨詢工程師《宏觀經(jīng)濟政策與發(fā)展規(guī)劃》每日一練(9.5)
- 72015年安全工程師考試《安全生產(chǎn)技術(shù)》:井下作業(yè)安全要求
- 82012年一級建造師:建筑工程考點總結(jié)(5)
- 9咨詢工程師考試《項目決策分析與評價》模擬題(9)
- 10輸油管道事故頻發(fā) 還有多少建筑坐在火山口上
- 112015年造價工程師輔導:項目融資主要方式(2)
- 12造價工程師技術(shù)與計量復習要點:有關(guān)陽臺的模板
- 132015年咨詢工程師《宏觀經(jīng)濟政策與發(fā)展規(guī)劃》每日一練8.20
- 142015年招標師全真模擬試題6
- 152015年二級建造師《建筑》:混凝土面板的施工程序
- 16造價工程師技術(shù)與計量(建筑)復習要點:招標個控制價
- 172013年二級建造師《建筑》:模板工程
- 182013年二級建造師《施工管理》每日一練(1.25)
- 192015年造價員基礎知識:輸送機械的分類
- 202015咨詢工程師考試《項目決策分析與評價》試題(3)
- 21安全工程師法規(guī)復習要點:法律效力
- 22項目管理部 內(nèi)容
- 232015年一級建造師《法規(guī)》:糾紛的處理(5)
- 24歷年真題對于二級建造師復習的重要性
- 252013年二級建造師《法規(guī)》:訴訟時效的種類
- 26當前國內(nèi)新型腳手架發(fā)展概況
- 272015一級建造師《市政工程》知識點摘要(2)
- 282015招標師《法律法規(guī)與政策》:開標的程序和內(nèi)容
- 29遼寧省2008年造價工程師報名時間/報名地點/報名條件討論區(qū)
- 30安全工程師維修電工(初級)試題(二)
成都公司:成都市成華區(qū)建設南路160號1層9號
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務大廈18樓