QUEST Methods and techniques used to examine cost and technical data are called feasibility studies.  The economic aspects of a feasibility study include interest rates, present worth factors, operating costs, depreciation and _____. 
A Capitalization costs. 
B Technical skill requirements. 
C Technology forecasting. 
D Strategic marketing intelligence. 
E All of the above. 
參考答案:A

QUEST Cost management includes: 
A Cost estimating/forecasting. 
B Cost budgeting/cost control. 
C Cost applications. 
D All of the above. 
E A and B only. 
參考答案:D

QUEST A variance envelope has been established on a project.  The envelope goes from +-30% in R&D to +-5% during manufacturing.  The reason for the change in thickness of the envelope is because: 
A The management reserve has been used up. 
B The accuracy of the estimates in manufacturing are worse than the estimates in R & D. 
C Tighter controls are always needed as a project begins to wind down. 
D Of the personal desires of the project sponsor. 
E Of none of the above 
參考答案:E

QUEST Which of the following would most likely increase the accuracy of estimating the project cost? 
A Pricing out the work at lower levels in the work breakdown structure. 
B Using historical data. 
C Talking to people who have worked on similar projects. 
D All of the above. 
E A and C only. 
參考答案:D

QUEST Life cycle costing is the total cost to the customer for the acquisition and ownership over its full life.  Life cycle costing categories include the cost of _____, _____, and _____. 
A R & D, maintainability, operation and support. 
B R & D, production, operation and support. 
C Acquisition, operations, maintenance. 
D Production, operations, maintenance. 
E None of the above 
參考答案:B

相關(guān)試題:

2010年P(guān)MP美國(guó)項(xiàng)目管理考試習(xí)題及答案五十六

試題推薦:

2010年P(guān)MP美國(guó)項(xiàng)目管理認(rèn)定考試全真模擬試題精選1

2010年P(guān)MP美國(guó)項(xiàng)目管理認(rèn)定考試全真模擬試題精選2

2010年P(guān)MP美國(guó)項(xiàng)目管理認(rèn)定考試全真模擬試題精選3

發(fā)布:2007-03-02 10:54    編輯:泛普軟件 · xiaona    [打印此頁(yè)]    [關(guān)閉]
相關(guān)文章:

泛普軟件項(xiàng)目管理工具其他應(yīng)用

項(xiàng)目管理工具 禪道項(xiàng)目管理軟件 夢(mèng)龍項(xiàng)目管理軟件 微軟項(xiàng)目管理軟件 裝飾管理系統(tǒng) 裝修預(yù)算軟件 項(xiàng)目計(jì)劃軟件 項(xiàng)目進(jìn)度管理軟件 軟件項(xiàng)目管理工具 材料管理軟件 工程項(xiàng)目管理軟件系統(tǒng) 項(xiàng)目管理系統(tǒng) 施工管理軟件 建筑工程項(xiàng)目管理軟件 工程管理軟件