當(dāng)前位置:工程項(xiàng)目OA系統(tǒng) > 建筑OA系統(tǒng) > 軟件項(xiàng)目管理工具
2010年P(guān)MP美國(guó)項(xiàng)目管理考試習(xí)題及答案五十七
申請(qǐng)免費(fèi)試用、咨詢(xún)電話(huà):400-8352-114
QUEST Methods and techniques used to examine cost and technical data are called feasibility studies. The economic aspects of a feasibility study include interest rates, present worth factors, operating costs, depreciation and _____.
A Capitalization costs.
B Technical skill requirements.
C Technology forecasting.
D Strategic marketing intelligence.
E All of the above.
參考答案:A
QUEST Cost management includes:
A Cost estimating/forecasting.
B Cost budgeting/cost control.
C Cost applications.
D All of the above.
E A and B only.
參考答案:D
QUEST A variance envelope has been established on a project. The envelope goes from +-30% in R&D to +-5% during manufacturing. The reason for the change in thickness of the envelope is because:
A The management reserve has been used up.
B The accuracy of the estimates in manufacturing are worse than the estimates in R & D.
C Tighter controls are always needed as a project begins to wind down.
D Of the personal desires of the project sponsor.
E Of none of the above
參考答案:E
QUEST Which of the following would most likely increase the accuracy of estimating the project cost?
A Pricing out the work at lower levels in the work breakdown structure.
B Using historical data.
C Talking to people who have worked on similar projects.
D All of the above.
E A and C only.
參考答案:D
QUEST Life cycle costing is the total cost to the customer for the acquisition and ownership over its full life. Life cycle costing categories include the cost of _____, _____, and _____.
A R & D, maintainability, operation and support.
B R & D, production, operation and support.
C Acquisition, operations, maintenance.
D Production, operations, maintenance.
E None of the above
參考答案:B
相關(guān)試題:
2010年P(guān)MP美國(guó)項(xiàng)目管理考試習(xí)題及答案五十六
試題推薦:
2010年P(guān)MP美國(guó)項(xiàng)目管理認(rèn)定考試全真模擬試題精選1
2010年P(guān)MP美國(guó)項(xiàng)目管理認(rèn)定考試全真模擬試題精選2
2010年P(guān)MP美國(guó)項(xiàng)目管理認(rèn)定考試全真模擬試題精選3
- 1建筑工程檢測(cè)試驗(yàn)技術(shù)管理規(guī)范術(shù)語(yǔ)
- 2特殊條件下矩形薄壁空心高墩墩身施工工法(大塊組合翻轉(zhuǎn)模板 三級(jí)工法)
- 3云南省2015年安全工程師考試報(bào)名時(shí)間為4月10日-5月10日
- 4如何選擇合適的混凝土輸送泵攪拌器
- 5宿遷市實(shí)施三大工程提升村莊環(huán)境品質(zhì)
- 6宏觀(guān)經(jīng)濟(jì)政策與發(fā)展規(guī)劃知識(shí)點(diǎn):產(chǎn)業(yè)政策的實(shí)施
- 7廈深鐵路抓緊后期施工 年底深圳廈門(mén)實(shí)現(xiàn)高鐵接駁
- 8園建、綠化工程施工組織設(shè)計(jì)
- 92015年招標(biāo)師考試每日一練(8月30日)
- 10天津?yàn)I海國(guó)貿(mào)中心扣件式高支模設(shè)計(jì)與施工
- 11安全工程師輔導(dǎo)資料:電力生產(chǎn)中危險(xiǎn)點(diǎn)的查找與預(yù)控2
- 12煙臺(tái)某會(huì)展中心基礎(chǔ)防水施工方案(LM涂膜防水)
- 132015年一級(jí)建造師考試《法規(guī)及相關(guān)知識(shí)》名師剖析(19)
- 142015招標(biāo)師考試項(xiàng)目管理考點(diǎn):招標(biāo)采購(gòu)項(xiàng)目計(jì)劃的編制
- 15吉林:今年將建3300公里農(nóng)村公路
- 16大跨度鋼箱系桿拱橋懸臂拼裝施工工法(國(guó)家工法)
- 17陜西省2008年度造價(jià)工程師執(zhí)業(yè)資格考試5月19日至5月29日?qǐng)?bào)名
- 182015年二級(jí)建造師《公路》重點(diǎn):工程決算階段造價(jià)控制
- 192015年咨詢(xún)工程師《項(xiàng)目決策分析與評(píng)價(jià)》每日一練(5.28)
- 20廣東:2009年注冊(cè)安全工程師考試3月31日開(kāi)始(考試動(dòng)態(tài))
- 212015年安全工程師考試《安全生產(chǎn)法及相關(guān)法律知識(shí)》模擬習(xí)題(3)
- 222015招標(biāo)師備考需多久
- 23[北京]大型體育館鋼結(jié)構(gòu)工程施工進(jìn)度計(jì)劃圖(Project編制)
- 24大跨度地下洞庫(kù)施工模板支撐技術(shù)
- 252015年全國(guó)二級(jí)建造師執(zhí)業(yè)資格考試相關(guān)用書(shū)介紹
- 26[威海市]06年安全工程師考試報(bào)名數(shù)據(jù)核對(duì)6.1-9日
- 27【招標(biāo)師考試】項(xiàng)目管理與招標(biāo)采購(gòu)第三章:水路運(yùn)輸
- 2840萬(wàn)淅川人為南水北調(diào)離故土 移民強(qiáng)度超過(guò)三峽
- 29政府采購(gòu)聯(lián)合體組成要符合九個(gè)條件
- 302015年咨詢(xún)工程師《宏觀(guān)經(jīng)濟(jì)政策與發(fā)展規(guī)劃》每日一練5.29
成都公司:成都市成華區(qū)建設(shè)南路160號(hào)1層9號(hào)
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓