PMP項目管理:項目集成管理練習題4
1.In order to manage a project effectively, work should be broken down into small pieces.Which of the following does NOT describe how far each task should be broken down?
A.Can be completed in under 80 hours
B.Can not be logically subdivided further
C.Is done by one person
D.Can be realistically estimated
為了有效的管理項目,應該將工作分解為小塊。以下各項中哪項不能說明任務應該分解到什么程度?
A.可以在80小時以下完成。
B.不能再進一步進行邏輯細分了。
C.可由一個人完成。
D.可以進行實際估算。
2.Customer is requiring scope changes.In order to analyze the influences to the project, PM should review WBS, change request, scope management plan and –
A.Performance Report
B.RAM
C.Pareto Diagram
D.Monte Calro Simulation
客戶要求進行范圍變更。為了分析變更對項目的影響,項目經(jīng)理應該回顧工作分解結構、變更請求、范圍管理計劃和_______?
A.績效報告
B.職責分配矩陣
C.帕累托圖
D.蒙特卡洛模擬
3.A project manager may use to _______make sure the team clearly knows what work is included in each of their tasks?
A.A project scope of work
B.A project charter
C.A WBS dictionary
D.A risk management plan
項目經(jīng)理可以使用_______來保證項目團隊清楚的了解到他們的每一項任務包含的工作。
A.項目工作范圍
B.項目章程
C.WBS詞典
D.風險管理計劃
4.The WBS is an input to scope change control because it-
A.Provides information on project objectives
B.Defines the project’s scope baseline
C.Defines all project baselines
D.Provides information on scope performance
工作分解結構是范圍變更控制的一個輸入,因為它:
A.為項目目標提供信息
B.定義了項目的范圍基準計劃
C.定義所有項目基準計劃
D.為執(zhí)行范圍提供信息
5.The scope of a project can be expected to change during the project life cycle.The document that describes how the project scope changes will be integrated into the project is the:
A.WBS dictionary
B.Scope statement
C.Scope management plan
D.Project Charter
在項目生命周期內(nèi),可能想要變更項目范圍。表述項目范圍的變更怎樣整合到項目之中的文件是:
A.工作分解結構WBS字典
B.范圍說明書
C.范圍管理計劃
D.項目章程
6. Project managers normally manage to the third level of the WBS.Managing at this level allows the project manager to:
A.Supervise all technical work
B.Control the work package elements
C.Exercise his or her technical expertise
D.Maintain better control of integrated efforts
項目經(jīng)理通常管理工作分解結構WBS的第3級,該水平的管理讓項目經(jīng)理去:
A.監(jiān)督所有技術工作
B.控制工作模塊要素
C.發(fā)揮自己的技術專長
D.更好地保持控制整合工作
7.You have been assigned as a project leader and must first review the statement of work provided by the customer.Although the answer can vary based on the industry, choose which one of the following are you most likely to overlook?
A.Data item deliverables
B.Customer-furnished equipment and facilities
C.Long-lead procurement items
D.Customer-imposed milestones
你被安排負責項目,首先必須檢查評審客戶提供的工作說明書。盡管不同的產(chǎn)業(yè)會有不同的答案,你最可能忽視下列哪項:
A.工作成果數(shù)字化
B.客戶提供的設施
C.長期重要的采購內(nèi)容
D.客戶要求的工作里程碑
8.To further ensure that the work outputs of the project are accepted by the customer, the project team should:
A.Change the project scope when requested by the customer
B.Follow a scope verification process
C.Modify the project plan and baseline as needed.
D.Use a PERT Chart
為了進一步確??蛻艚邮茼椖康墓ぷ鹘Y果,項目團隊應該:
A.當客戶要求時,變更項目范圍
B.遵循范圍確證過程
C.根據(jù)需要調(diào)整項目計劃和基準
D.利用計劃評審技術PERT圖
9.Scope changes on projects are inevitable.However, scope changes can be minimized by:
A.Effective implementation of the scope management processes
B.Spending more time analyzing where the estimates came from and who did the estimating
C.Asking the sponsor to supervise all of the planning
D.Developing a detailed Project Charter
項目范圍變更在所難免。然而,要盡可能減少范圍變更可以借助于:
A.有效完成范圍管理過程
B.花更多時間分析估算是怎樣得出的及是誰做估算
C.請求業(yè)主監(jiān)督規(guī)劃的所有事項
D.制定詳盡的項目章程
10.A company convenes an estimating team to bid competitively on a project.Later, a negotiation team made up of different people is established to negotiate the final price.The project manager was not part of either team and is assigned after negotiations were completed and the contract was signed.A good project manager should mainly:
A.Disregard the assumptions/constraints used in estimating the job
B.Review the documents that authorize the project and define its objectives
C.Focus heavily on comparing the contractual statement of work with the proposal statement of work
D.Request a new project charter
某公司召集一個估算團隊來對項目競標報價。稍后,由不同的人組建了一個談判團隊來談判決定最終價格。在完成了談判并簽訂了合同后,才任命了項目經(jīng)理,他并不是上述兩個團隊的成員。一個好的項目經(jīng)理應該主要:
A.不考慮工作估算所作的假定或條件限制
B.了解檢查項目授權和項目目標的文件.
C.集中精力比較工作的合同要求說明書和工作建議說明書
D.要求制定新的項目章程
11.A project charter is a document issued by a _______that provides the project manager with the authority to apply organizational resources.
A.System manager
B.Functional manager
C.Manager external to the project
D.Customer
項目章程授予項目經(jīng)理職權去運用組織資源,這個文件是由誰發(fā)出:
A.系統(tǒng)經(jīng)理
B.職能經(jīng)理
C.項目外的經(jīng)理
D.客戶
12.A project team member identifies a technical issue that may require a scope change.The project manager should:
A.Accept the change and inform the customer
B.Submit a request to a review board
C.Contact the sponsor for approval
D.Rewrite the statement of work to include the change
一項目團隊成員發(fā)現(xiàn)一個技術問題,這可能要求范圍變更。項目經(jīng)理應該:
A.接受變更并通告客戶
B.向評審委員會遞交變更要求
C.與業(yè)主聯(lián)系以獲得其批準
D.重寫工作說明書,使其包括變更問題
13. The work breakdown structure is an excellent tool for objective control and evaluation.Which of the following is generally not validated through the WBS?
A.Time, schedule, and cost
B.Management coordination and organizational structuring
C.Risk and impact of decision-making
D.Quality of the work
工作分解結構對于目標控制和評估是一個極好的工具。下列哪一項一般不會通過工作分解結構WBS來獲得有效確認?
A.時間,進度和成本
B.管理協(xié)調(diào)和組織安排
C.決策的風險和影響
D.工作的質量
14.The elaboration of project work and the identification of project deliverables and project objectives, are identified in the _______process of the project and are documented in the project’s_______ .
A.Scope planning, scope statement
B.Initiation, charter
C.Initiation, scope statement
D.Scope planning, charter
項目工作的細化及項目交付物和項目目標的確認, 這些都要明確在項目的_______過程中并且記錄在項目的 _______。
A.范圍規(guī)劃,范圍說明書
B.立項,章程
C.開始,范圍說明書
D.范圍規(guī)劃, 章程
答案:
1. C 2. A 3. C 4. B 5. C
6. D 7. A 8. B 9. A 10. B
11. C 12. B 13. D 14. A
- 1夏季攪拌車胎壓不宜過高
- 22015年招標師全真模擬試題10
- 3北京地安門外大街沿線建筑高度禁超鼓樓
- 42015年齊齊哈爾造價工程師報名時間
- 5大模板堆放的安全要求
- 62015年造價工程師輔導:稅收法律(2)
- 7混凝土泵使用注意事項
- 82015年招標師全真模擬試題12
- 92013年新疆二級建造師重新注冊申請表
- 102015年注冊安全工程師《相關法律知識》模擬試題(26)
- 11邊坡綠化施工組織設計17p
- 12【招標師考試】項目管理與招標采購第二章:市場準入的法律法規(guī)
- 13淺談卸料平臺的安裝
- 14錨桿支護技術發(fā)展的展望
- 15克拉瑪依市2008年度全國造價工程師執(zhí)業(yè)資格考試6月1日-25日報名
- 16格子梁錨桿加固邊坡施工工藝流程
- 17杭南長客運專線明年通車 南昌到長沙只需1.5小時
- 18無錫市2015年造價工程師考試現(xiàn)場確認材料
- 19造價工程師技術與計量(土建)復習資料——軟化性
- 20園林水景施工組織設計50p(水池水景)
- 21下列文件中,不屬于對監(jiān)理人有約束力的是哪個
- 22泰州市2015年造價工程師考試補報名時間為6月3日
- 232015年咨詢工程師《政策與規(guī)劃》每日一練(5.8)
- 242015年咨詢工程師《工程咨詢概論》模擬題(4)
- 252013二級建造師《施工管理》每日一練匯總(12.31-1.6)
- 262013年吉林二級建造師重新注冊申請表
- 272015年招標師采購案例分析全真模擬題12
- 28埋地鋼質管道外加電流陰極保護技術 30p
- 29煤礦防爆混凝土泵S閥系統(tǒng)的操作要求
- 302015年造價工程師考試土木工程復習資料—隧道
成都公司:成都市成華區(qū)建設南路160號1層9號
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務大廈18樓