PMP認(rèn)證考試練習(xí)題及參考答案(十九)
1. history has shown that project managers can be trained in a combination of ways. which method is usually
preferred by most companies?
a. experiential learning, on-the-job
b. formal education and special course (degreed programs)
c. professional activities, seminars
d. individual readings
e. none of the above考試大(www.Examda。com)
ans: a
2. the purpose of configuration management is to:
a. insure drawings are updated
b. control change throughout the project
c. control change during the production only
d. generate engineering change proposals
e. inform the project manager of changes
ans: b
3. three types of written media used in organizations are _____, _____, and ______.
a. manual, letters, guidelines
b. individually-oriented, legally-oriented, organizationally oriented
c. guidelines, forms, procedures
d. letters, guidelines, brochures來源:考試大
e. letters, contracts, policies.
ans: d
4. which of the following is considered a direct cost for producing a widget?
a. the cost of the materials used to produce a widget.
b. the labor costs of the workers who actually produced the widget.
c. the rent for the building in which the widget was manufactured
d. the salary of senior management and the project sponsor
e. a and b only
ans: e
5. _____ best describes the goal of a project in its relationship with the customer, from initial contact
through delivery.
a. fitness for use
b. customer satisfaction
c. conformance to requirements
d. fitness for purpose
e. all of the above.來源:考試大網(wǎng)
ans: b
6. a communicator can present information using the following media except:
a. visual
b. audio
c. tactile
d. performal
e. both a and b
ans: d
7. advantages of the functional (hierarchical) form of organization include _____ and creation of technical
competence.
a. ease of horizontal coordination
b. clearly defined authority
c. high information processing capability
d. single voice to customers
ans: b來源:www.examda.com
8. quality and _____ are directly related.
a. productivity
b. cost overruns
c. scope control
d. pareto diagram
e. none of the above.
ans: a
9. resource leveling will often affect the project by making it:
a. shorter.
b. longer
c. more responsive to customer needs.
d. a and c
e. b and c.
ans: b來源:考試大
10. selection criteria for project selection include:
a. cost versus benefit
b. risk
c. contribution towards organizational goals
d. rate of return
e. all of the above.
ans: e
11. the statement of work (sow) is developed during the _____ cycle.
a. award
b. solicitations
c. requirementswww.Examda.CoM
d. contractual
e. requisitions
ans: c
12. which of the following depreciation methods provides for accelerated depreciation of an asset:
a. double declining balance.
b. straight line.
c. exponential depreciation
d. double sum of the years digits
e. double increasing balance
ans: a
- 12015年造價工程師《理論與法規(guī)》知識點(6)
- 22012一級建造師《公路工程》:公路工程項目竣工決算的作用
- 32014年我國建筑節(jié)能方面投入將超過40億元
- 4慈溪市某引水應(yīng)急工程引水隧洞施工組織設(shè)計
- 5一級建造師市政公用工程管理與實務(wù):脹縫的構(gòu)造
- 6礦井水害的防治措施
- 72015年造價工程師考試《理論與法規(guī)》知識點總結(jié)(8)
- 8廣州市某高層防滲漏工程施工方案
- 92012一級建造師《建設(shè)工程經(jīng)濟》工程造價基礎(chǔ)知識問題解答(2)
- 102015年二級建造師《法規(guī)》重點:財產(chǎn)權(quán)體系
- 11一級建造師管理與實務(wù)復(fù)習(xí)要點:粉煤灰
- 122010年P(guān)MP美國項目管理考試習(xí)題及答案四十五
- 132015年咨詢工程師《宏觀經(jīng)濟政策》練習(xí)題(10)
- 142015年注冊咨詢師《項目決策分析與評價》最新模擬試題(4)
- 15泰柏板保溫在工程中的應(yīng)用
- 162012年一級建造師《建設(shè)工程法規(guī)及相關(guān)知識》考前沖刺要點(一)
- 172012年一級建造師建筑工程:樓地層
- 182013年寧夏二級建造師注冊證書、執(zhí)業(yè)印章遺失補辦申請表
- 19某污水處理廠施工組織設(shè)計140P
- 20監(jiān)理工程師進行質(zhì)量檢驗與控制所依據(jù)的專門技術(shù)法規(guī)性文件包括
- 21工程質(zhì)量事故的特點主要有哪些
- 22某高校新校區(qū)水暖電安裝施工組織設(shè)計96p
- 23某大橋主跨鋼桁梁斜拉橋跨中合龍施工
- 24PMP美國項目管理認(rèn)證模擬預(yù)測習(xí)題2
- 25柱的吊升方法有幾種
- 262015年招標(biāo)師《法律法規(guī)》:合同爭議解決
- 272015年招標(biāo)師考試招標(biāo)采購法律法規(guī)與政策輔導(dǎo)講義十九
- 282015年二級建造師《建筑》:招標(biāo)投標(biāo)法的要點條款
- 292015年咨詢工程師:能源需求彈性
- 30安徽某體育場看臺防水及面層施工方案
成都公司:成都市成華區(qū)建設(shè)南路160號1層9號
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓