PMP認證考試練習題及參考答案(十七)
1. you must produce 27 widgets. you can only produce 9 widgets per production run. each production line setup costs $1000. each widget
consumes $10 worth of material and $5 worth of labor. what is total variable cost for producing one widget.
a. 1020
b. 1010
c. 1015考試大論壇
d. 20
e. none of the above
ans: e
2. creation of project objectives:
a. allows for data collection and analysis and progress reporting against which standards of performance can be measured.
b. is accomplished by selection of measurable variables against which performance can be judged.
c. is required before funding of the project by the project sponsor.
d. all of the above.
e. a and b only
ans: e
3. during which phase of the project life cycle is the amount at stake lowest?
a. concept
b. development
c. execution
d. conclusion來源:www.examda.com
e. c and d
ans: a
4. techniques that can improve communication include:
a. establishing a single, one-way communications channel
b. avoiding face-to-face communication
c. using redundancy (i.e. saying it two different ways) whenever possible
d. disregarding the sensitivity of your receiver
e. all of the above.
ans: c
5. the delphi method is well-suited for:
a. decision-making
b. forecasting
c. overhead rate estimating
d. all of the above
e. a and b only
ans: e
6. the zero defects concept
a. is a performance standard for management
b. is a motivational technique that promotes "doing it right the first time".
c. is used by management to communicate to all employees that everyone should do things right the first time.
d. a and c.
e. b and c來源:考試大
ans: d
7. what tool have project managers come to use to identify all of the costs associated with a project.
a. a bill of materials
b. a gantt chart
c. an arrow diagram network.
d. a work breakdown structure.
e. b and c only.
ans: d
8. _____ is a receipt issued by a carrier for merchandise to be delivered to a party at some destination.
a. proforma invoice
b. inspection certificate
c. packing list
d. bill of lading
e. none of the above.
ans: d
9. a program is characterized as:
a. a grouping or related tasks lasting one year or less.
b. a unique undertaking having a definite time period.
c. a grouping of similar projects having no definite end that supports the product(s) from cradle to grave.
d. a project with a cost over $1 million.來源:考試大
e. none of the above.
ans: c
10. contingency planning should include all but which of the following?
a. the development of a contingency allowance determined by combining (layering) various estimate segments to form larger estimate segments.
b. the development of schedule alternatives and work-around
c. the management of a contingency budget
d. an assessment of project shut-down liabilities.
e. a and c
ans: a
11. from an operating or functional perspective, there are various objectives of purchasing and materials management. which is not one of these
objectives?
a. to buy competitively
b. to support company operations with an uninterrupted flow of materials and services
c. to develop reliable and effective sources of supply
d. to achieve maximum integration with the other departments of the firm
e. to attain approval from each department of every purchase
ans: e
12. in order to achieve long-term quality improvements, management must do the following:
a. motivate the employees with seminars, contests, and institute programs such as "quality improvement' day.
b. create a quality control department and give the head of the department ultimate responsibility for quality improvement.
c. implement of a formal quality control program with worker and management involvement.
d. establish financial incentive packages for worker.
e. a and d
ans: c
- 1選購原木門技巧
- 2一級建造師工程經(jīng)濟復(fù)習要點:遞延所得稅負債
- 32015招標師法規(guī)與政策考前知識點:機電產(chǎn)品國際招標項目
- 4上航局連中連云港兩工程項目
- 52015年咨詢工程師知識點:具體項目論證
- 62015年二級建造師《建筑》:綁扎腳手架
- 72015年招標師《專業(yè)實務(wù)》輔導(dǎo):貨物采購分標
- 8采購合同的審批權(quán)限 內(nèi)容
- 9宏觀經(jīng)濟政策與發(fā)展規(guī)劃考點:規(guī)范政府核準制
- 10《工程項目組織與管理》:工作定義的依據(jù)
- 11合肥房屋靠太陽降溫 這不科學(xué)?
- 12[云南?。?005造價工程師5月9至5月27報名
- 13[福建]政府強拆"釘子戶" 稱其漫天要價影響工期
- 14經(jīng)濟政策與發(fā)展規(guī)劃知識點:新型工業(yè)化的特征
- 152015年安全工程師考試《安全生產(chǎn)法及相關(guān)》練習題(26)
- 162015年天津注冊消防工程師報名時間
- 17貴州森林公園改建高爾夫球場 曾被要求停工未果
- 18[上海]06年度造價師考試合格人員填表要求
- 192015年招標師法律法規(guī)政策考試練習題(15)
- 20安全工程師生產(chǎn)法復(fù)習資料——煙花爆竹安全生產(chǎn)標準體系
- 21全國監(jiān)理工程師2015年考試《合同管理》習題(8)
- 22中國境內(nèi)的主要地震帶
- 23項目決策分析與評價知識點:選址原則及注意事項
- 24《項目管理與招標采購》考前提高試題12
- 252015年招標師法律法規(guī)高頻考點:評標委員會的組成
- 262015.4.15咨詢工程師每日一練免費在線測試
- 272015年咨詢工程師《工程咨詢概論》每日一練3.19
- 28如何檢查攪拌車的火花塞?
- 29江蘇連云港市開發(fā)區(qū)借鑒PMC模式控制造價
- 30項目管理與招標采購第二章:工程建設(shè)項目合同管理的重要性
成都公司:成都市成華區(qū)建設(shè)南路160號1層9號
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓