PMP認證考試練習(xí)題及參考答案(十六)
1. fixed-price and incentive-type contracts place responsibility for performance and financial risks associated with delay or non-performance on
the:
a. buyer
b. third party
c. contractor
d. all of the above
e. none of the above
ans: c來源:考試大
2. in a contract, the point of total assumption refers to the point where:
a. the customer incurs the total financial responsibility for each additional dollar spent.
b. the contractor incurs the total financial responsiblity for each dollar spent.
c. the schedule and cost variance are zero.
d. the customer will incur no further costs for the work the contractor performs in the completion of the contract.
e. b and d only.
ans: e
3. in a matrix organizational form, mbo may be difficult to implement:
a. if the functional employees are supervised closely by the line manager rather than the project manager
b. unless the project manager has an input into the employee's performance review
c. unless the project and line managers agree on the ultimate objective
d. unless the project and line managers agree to the duration of the task
e. none of the above are correct answers考試大(www.Examda。com)
ans: e
4. quality assurance
a. refers to the prevention of product defects
b. is an auditing function that provides feedback to the project team and client about the quality of output being produced.
c. is the technical process that include the construction of control charts which specify acceptability limits for conforming output.
d. a and b.
e. b and c
ans: b
5. which of the following communication media is least accepted by organizations?
a. tactile
b. audio
c. extrasensory
d. visual來源:考試大
e. olfactory
ans: c
6. formal written communication is mandated for which of the following?
a. scope changes not part of the original project
b. taking exception to a specification
c. procurement of raw materials
d. all of the above.
e. a and b only
ans: d
7. in performing an impact analysis, the most effective tool to ensure all risks are identified on large projects is the:
a. work breakdown structure
b. milestone review and schedule technique
c. cost/schedule control system
d. planning programming budget system
e. program and evaluation review technique
ans: a
8. in the project environment, the individual ultimately responsible for quality control is:
a. the line workers who must strive "to do things right the first time" to avoid quality problems.
b. the company's quality control manager who must work with the project members to ensure the quality control program is effective.
c. the head of the production department who retains ultimate quality control responsibility for all the company's projects.
d. the project manager who has ultimate responsibility for the entire project.
e. the customer who must ensure that he is receiving a quality product from the vendor.
ans: d
9. in which organizational form do project managers usually get to know the employees well enough to provide an input into their performance
review?
a. expediter
b. coordinator來源:考試大網(wǎng)
c. pure project
d. matrix
e. line-staff
ans: c
10. the critical path in a schedule network is the path that:
a. takes the longest time to complete
b. must be done before any other tasks
c. allows some flexibility in scheduling a start time.
d. is not affected by schedule slippage
e. all of the above.
ans: a
11. the use of the project reports:
a. are not necessary on small projects
b. provides a means whereby various levels of authority can judge project performance
c. provides insight into project areas and the effectiveness of the control systems
d. all of the above
e. b and cwww.Examda.CoM
ans: e
12. you must produce 27 widgets. you can only produce 9 widgets per production run. each production line setup costs $1000. each widget
consumes $10 worth of material and $5 worth of labor. what is the total fixed cost for producing the widgets.
a. 3000
b. 27000
c. 27270
d. 1335
e. 1000
ans: e
- 1《工程招投標(biāo)概論》復(fù)習(xí)題及參考答案(4)
- 2一級注冊消防工程師考試培訓(xùn)資料
- 3韶關(guān)市2015年度造價工程師考試報名時間為6月8日至7月2日
- 42015項目管理與招標(biāo)采購考點:服務(wù)項目采購
- 5建筑物標(biāo)高有哪些控制?
- 6某框架結(jié)構(gòu)會展中心消防工程施工組織設(shè)計
- 7安全工程師安全生產(chǎn)法復(fù)習(xí)資料——煤礦安全監(jiān)察機構(gòu)的職責(zé)
- 8安全工程師輔導(dǎo)資料:電力企業(yè)安全生產(chǎn)和安全管理1
- 9安全工程師考試《安全生產(chǎn)管理》模擬題(18)
- 102008年安全工程師考試《安全生產(chǎn)技術(shù)》習(xí)題九
- 11道路排水工程
- 12工程造價基礎(chǔ)知識建設(shè)項目投資估算:投資估算的概念與作用
- 13安全工程師安全生產(chǎn)法復(fù)習(xí)資料——拆除工程的特殊規(guī)定
- 14安全工程師安全生產(chǎn)法復(fù)習(xí)資料——事故責(zé)任主體的確定
- 15國際項目溝通管理
- 16填區(qū)雨水滲透設(shè)施計算方法及關(guān)鍵系數(shù)
- 17安全工程師輔導(dǎo)資料:電器倒閘操作確保人身設(shè)備安全3
- 182015年監(jiān)理工程師考試《合同管理》練習(xí)(14)
- 19如何預(yù)防攪拌車輪轂甩油輪轂軸承
- 20一級建造師管理與實務(wù)復(fù)習(xí)要點:桿距和擋距
- 21高層建筑的高程傳遞方法及精度分析
- 22廣西開展傳統(tǒng)村落調(diào)查工作
- 23幕墻施工過程的質(zhì)量管理
- 242015年咨詢工程師考試《項目決策分析與評價》模擬試題(9)
- 25全站儀在施工放樣中精度的探討
- 26二建復(fù)習(xí)資料土方工程質(zhì)量標(biāo)準(zhǔn)
- 272015年招標(biāo)師《案例分析》:怎樣審查資格
- 2808年安全工程師《安全生產(chǎn)法及相關(guān)法律》習(xí)題四(無答案)
- 292015年注冊安全工程師《相關(guān)法律知識》模擬試題(31)
- 30深層攪拌樁施工工法
成都公司:成都市成華區(qū)建設(shè)南路160號1層9號
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓