監(jiān)理公司管理系統(tǒng) | 工程企業(yè)管理系統(tǒng) | OA系統(tǒng) | ERP系統(tǒng) | 造價(jià)咨詢管理系統(tǒng) | 工程設(shè)計(jì)管理系統(tǒng) | 甲方項(xiàng)目管理系統(tǒng) | 簽約案例 | 客戶案例 | 在線試用
X 關(guān)閉
軟件項(xiàng)目管理工具

當(dāng)前位置:工程項(xiàng)目OA系統(tǒng) > 建筑OA系統(tǒng) > 軟件項(xiàng)目管理工具

礪志PMP模擬題本周精選10

申請(qǐng)免費(fèi)試用、咨詢電話:400-8352-114

Qustions 1:
The output of scope change control consists of--

a.Scope changes, corrective action, and lessons learned
b. Corrective action, scope changes, and project plan updates
c. Performance measurement, additional planning, and lessons learned
d. Work results, product documentation, and formal acceptance

Qustions 3:

The scope statement--

a. Dose not include project objectives such as cost, schedule, or quality measures
b. Includes a description of project assumptions and constraints
c. Provides a documented basis for preparing the PERT/CPM network
d. Describes how the WBS will be structured

Qustions 5:

To relate the functional organizations to the WBS elements, the project manager should use a--

a.WBS index
b. Project WBS
c. Cost account matrix
d. Work package assignment idex

Qustions 2:
All the following are project selection methods except--

a. Logical Framework analysis
b. Analytic Hierarchy process
c. Expert judgment
d. Decision trees

Qustions 4:

The project charter should be issued by--

a. The project manager
b. The head of the performing organization
c. A manager external to the project
d. The project sponsor

Qustions 6:

Completion of project scope activities is measured against the --

a.Requirements
b.Project plan
c.Scope management plan
d.WBS
發(fā)布:2007-03-02 10:57    編輯:泛普軟件 · xiaona    [打印此頁]    [關(guān)閉]
相關(guān)文章:

泛普軟件項(xiàng)目管理工具其他應(yīng)用

項(xiàng)目管理工具 禪道項(xiàng)目管理軟件 夢(mèng)龍項(xiàng)目管理軟件 微軟項(xiàng)目管理軟件 裝飾管理系統(tǒng) 裝修預(yù)算軟件 項(xiàng)目計(jì)劃軟件 項(xiàng)目進(jìn)度管理軟件 軟件項(xiàng)目管理工具 材料管理軟件 工程項(xiàng)目管理軟件系統(tǒng) 項(xiàng)目管理系統(tǒng) 施工管理軟件 建筑工程項(xiàng)目管理軟件 工程管理軟件