當(dāng)前位置:工程項(xiàng)目OA系統(tǒng) > 建筑OA系統(tǒng) > 軟件項(xiàng)目管理工具
美國項(xiàng)目管理PMP認(rèn)證模擬考試試題精選3
The change control system includes--
a. Procedures to define how documents may be changed
b. Specific change requests expected on the project and plans to respond to each one
c. Performance reports that forecast project changes
d. A description of the functional and physical characteristics of an item or system
Qustions 3:
Typically, change control systems include automatic approval of certain types of changes. An example of such a change is one that is--
a. Suggested by the project sponsor
b. The result of an emergency
c. Suggested by the customer
d. Made mandatory by a new regulation
Qustions 5:
Rolling wave planning provides information on the work to be done--
a.
Throughout all phases of the project
b. For successful completion of the current phases of the project
c. For successful completion of the current phase and subsequent phases of the project
d. In the next phase of the project
Qustions 2:
According to Herzberg’s motivator-hygiene Theory of Motivation, if achievement, recognition, responsibility, advancement or promotion, and positive supervisor attitude are not present, employees will--
a. Become alienated with the organization and leave
b. Lack motivation but will not be dissatisfied with their work
c. Lack motivation and become dissatisfied with their work
d. Become dissatisfied only if they do not receive salary increases
Qustions 4:
Problem solving, which is an important activity on projects, consists of --
a. Influencing the organizations to get things done
b. Defining problems and making decisions
c. Conferring with others to reach a dicision
d. Producing key results expected by stakeholders
Qustions 6:
Configuration management describes procedures to apply technical and administrative direction. Which of the following tasks is not performed in configuration management --
a.
Identifying functional and physical characteristics of an item or system
b.
Controlling changes to characteristics
c.
Performing an audit to verifiy conformance to requierments
d.
Allowing automatic approval of changes
- 1清遠(yuǎn)市2015年造價(jià)工程師考試報(bào)名時間確定:5月11日至6月12日
- 2云桂鐵路廣西段三座隧道連續(xù)貫通實(shí)現(xiàn)新年開門紅
- 3采購方拒付貨款,采購方行使的是什么
- 4工程造價(jià)基礎(chǔ):項(xiàng)目管理的概念
- 5草坪與地被規(guī)程規(guī)范
- 6施工現(xiàn)場平面布置圖(消防 塔吊 臨電)
- 7無損檢測工藝規(guī)程(磁粉檢驗(yàn))
- 82015年安全工程師考試《生產(chǎn)技術(shù)》:建筑設(shè)計(jì)防火規(guī)范
- 9[江西省]06年造價(jià)工程師考試報(bào)名
- 10氯的危險(xiǎn)特性及泄漏應(yīng)急措施
- 11克拉瑪依市2008年度全國造價(jià)工程師執(zhí)業(yè)資格考試6月1日-25日報(bào)名
- 122015年招標(biāo)師:投標(biāo)文件的修改
- 13城市綠化植樹工程施工規(guī)范
- 14市政污水管道續(xù)建工程施工組織設(shè)計(jì)
- 15一級建造師實(shí)務(wù)復(fù)習(xí)要點(diǎn):維修工程的機(jī)械臺班閑置費(fèi)用
- 16江蘇省住房城鄉(xiāng)建設(shè)廳邀請專家座談全省村莊環(huán)境整治工作
- 17沉樁達(dá)不到設(shè)計(jì)控制要求的原因
- 18安全工程師考試《法律法規(guī)》習(xí)題班講義精選(151)
- 192015年湖北注冊安全工程師報(bào)名入口
- 20北京某住宅區(qū)廁浴間防水施工方案
- 212015年咨詢工程師考試宏觀經(jīng)濟(jì)政策與發(fā)展規(guī)劃試題5
- 22年咨詢工程師《工程咨詢概論》考試講義24
- 232015年嘉峪關(guān)造價(jià)工程師報(bào)名入口
- 242015年造價(jià)員基礎(chǔ)知識:三面投影圖的形成
- 25招標(biāo)師法律法規(guī)與政策鞏固練習(xí)題4
- 26市政道路排水施工組織設(shè)計(jì)28P
- 27某工業(yè)園區(qū)室外給排水工程施工組織設(shè)計(jì) 24p
- 282015年招標(biāo)師專業(yè)實(shí)務(wù)問答題
- 292013年二級建造師考試重點(diǎn)復(fù)習(xí):民事法律關(guān)系
- 30安全工程師案例分析復(fù)習(xí)要點(diǎn):應(yīng)急演練
成都公司:成都市成華區(qū)建設(shè)南路160號1層9號
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓