監(jiān)理公司管理系統(tǒng) | 工程企業(yè)管理系統(tǒng) | OA系統(tǒng) | ERP系統(tǒng) | 造價(jià)咨詢管理系統(tǒng) | 工程設(shè)計(jì)管理系統(tǒng) | 甲方項(xiàng)目管理系統(tǒng) | 簽約案例 | 客戶案例 | 在線試用
X 關(guān)閉
軟件項(xiàng)目管理工具

當(dāng)前位置:工程項(xiàng)目OA系統(tǒng) > 建筑OA系統(tǒng) > 軟件項(xiàng)目管理工具

PMP認(rèn)證考試練習(xí)題及參考答案(三)

申請免費(fèi)試用、咨詢電話:400-8352-114

1. management decision-making includes:
a. analysis of alternatives.
b. revisions/replanning.來源:www.examda.com
c. resource allocation.
d. modification or updating of goals and objectives.
e. all of the above.
ans: e

2. the basic terminology for networks includes:
a. activities, events, manpower, skill levels and slack.
b. activities, documentation, events, manpower and skill levels.
c. slack, activities, events, and time estimates.
d. time estimates, slack, sponsorship involvement, and activities.
e. time estimates, slack time, report writing, life cycle phases, and crashing times.
ans: c

3. the project manager must receive reports and briefings from engineers, contracting officers, procurement personnel and marketing people.
the project manager's communication dilemma is one of:
a. encoding
b. decoding
c. choice of a medium考試大(www.Examda。com)
d. one-way communication
e. all of the above.
ans: e

4. the technique most commonly used to determine the profitability of a project includes _____ methods.
a. net present value (npv).
b. return on investment (roi).
c. discounted cash flow (dcf)
d. payout time and risk sensitivity analysis.
e. all of the above.
ans: e

5. which of the following are part of the purchasing cycle:
a. define need
b. prepare and issue purchase order
c. inspect incoming goods
d. all of the above.
e. a and b onlyhttp://ks.examda.com
ans: e

6. which of the following is closest to juran's definition of quality:
a. conformance to requirements.
b. fitness for use.
c. continuous improvement.
d. customer focus.
e. all of the above.
ans: b

7. a project element which lies between two events is called:
a. an activity.
b. a critical path method.
c. a slack milestone.
d. a timing slot.
e. a calendar completion point.
ans: a來源:考試大網(wǎng)

8. employee unions would most likely satisfy which level in maslow's hierarchy of needs?
a. belonging
b. self-actualization
c. esteem
d. safety
e. empowerment
ans: a

9. management calls a meeting to explain to all employees the new benefits package for the rank and file. this is an example of:
a. upward communication
b. downward communication來源:考試大網(wǎng)
c. one-way communication
d. two-way communication
e. none of the above.
ans: c

10. project management/project planning is most closely aligned with:
a. long range/strategic planning (5 years or more).
b. intermediate range planning (1 to 5 years)
c. short range/tactical planning (1 year or less).
d. all of the above.
e. b and c.
ans: e

11. the profitability and technical data studies are provided in report format to owners and funders for acceptance. this type of report, used to
solicit funding, is referred to as a(n) _____.
a. project feasibility study.
b. economic evaluation analysis.
c. risk management manual.
d. prospectus.
e. none of the above
ans: d

12. which of the following constitute juran's "quality trilogy":
a. planning, inspection, control.
b. planning, improvement, control.
c. planning, organization, control.考試大論壇
d. product, price, customer.
e. design, build, deliver.
ans: b

發(fā)布:2007-03-02 10:51    編輯:泛普軟件 · xiaona    [打印此頁]    [關(guān)閉]
相關(guān)文章:

泛普軟件項(xiàng)目管理工具其他應(yīng)用

項(xiàng)目管理工具 禪道項(xiàng)目管理軟件 夢龍項(xiàng)目管理軟件 微軟項(xiàng)目管理軟件 裝飾管理系統(tǒng) 裝修預(yù)算軟件 項(xiàng)目計(jì)劃軟件 項(xiàng)目進(jìn)度管理軟件 軟件項(xiàng)目管理工具 材料管理軟件 工程項(xiàng)目管理軟件系統(tǒng) 項(xiàng)目管理系統(tǒng) 施工管理軟件 建筑工程項(xiàng)目管理軟件 工程管理軟件