Qustions 1:Under the discounted cash flow approach, the project is acceptable if the--
a.Sum of the net present value of all estimated cash flow over the life of the project equals the profit
b. Present value of the inflow is greater that the present value of the outflow by a specified amount or percentage
c. Net present value of all future expected cash flow divided by the initial cash investment is greater than one
d. Payback period occurs by the second year of the project
Qustions 3:
At a minimum, the project charter should--
a. Describe the responsibilities and authority of the project manager and functional managers
b. Discuss the risks and constraints of the project and the plan to address those concerns
c. Designate the organizational structure of the project
d. State the business goals of the performing organization
Qustions 5:
A scope change is one that--
a.Modifies the project’s agreed-upon scope as defined by the WBS
b. Results in a change to all project baselines
c. Requires adjustments to cost, time, quality, and other objectives
d. Results in a lesson learned
Qustions 2:
A work package is a--
a. Deliverable at the lowest level of the WBS
b. Task with a unique identifier
c. Required level of reporting
d. Task that can be assigned to more that one organizational unit
Qustions 4:
The purpose of the review of deliverables and project performance at the conclusion of a project phase is to--
a. Determine how many resources are required to complete the project according to the project baseline
b. Adjust the schedule and cost baselines based on past performance
c. Obtain customer acceptance of project deliverables
d. Determine whether the project should continue to the next phase
Qustions 6:
Ideally, the project manager should be selected and assigned --
a.During the initiating process
b.During the project planning process
c.At the end of the concept phase of the project life cycle
d.Prior to the beginning of the development phase of the project life cycle
- 12015年招標(biāo)師《專業(yè)實(shí)務(wù)》:弱電系統(tǒng)集成項(xiàng)目招投標(biāo)要訣
- 2招標(biāo)師應(yīng)當(dāng)具備的職業(yè)能力
- 3河南2015安全工程師考試報(bào)名時(shí)間:2015年4月20日—4月27日
- 4[黃山市]06年安全工程師考試報(bào)名通知
- 52015年招標(biāo)師法律法規(guī)高頻考點(diǎn):招投標(biāo)爭(zhēng)議中行政處罰
- 62015年咨詢工程師每日一練免費(fèi)在線測(cè)試(2015.6.10)
- 7軟件項(xiàng)目管理在農(nóng)房建設(shè)質(zhì)量安全隱患多的原因是什么?
- 8廈門制定《農(nóng)村集體預(yù)留發(fā)展用地規(guī)劃建設(shè)管理辦法》
- 92015招標(biāo)師考試《項(xiàng)目管理與招標(biāo)采購(gòu)》模擬試題及答案3
- 102015年廈門造價(jià)工程師考試報(bào)名時(shí)間為5月8日-6月9日
- 11【招標(biāo)師考試】項(xiàng)目管理與招標(biāo)采購(gòu)第二章:管理部的全員管理
- 122015年咨詢工程師《工程項(xiàng)目組織與管理》每日一練8.16
- 132015招標(biāo)師考試:招標(biāo)采購(gòu)專業(yè)實(shí)務(wù)詳解21
- 14年末前國(guó)內(nèi)建筑鋼價(jià)上漲動(dòng)力缺失
- 15安全工程師考試《法律法規(guī)》習(xí)題班講義精選(36)
- 16安全工程師《生產(chǎn)法及法律知識(shí)》知識(shí)要點(diǎn)(6)
- 17招標(biāo)師考試:貨物采購(gòu)招標(biāo)投標(biāo)
- 18園林規(guī)劃中的施工圖規(guī)范
- 19[天津]超高層綜合樓施工進(jìn)度計(jì)劃圖(800天,project格式)
- 202015年咨詢工程師《工程咨詢概論》每日一練12.30
- 212015年兵團(tuán)造價(jià)工程師考試報(bào)名時(shí)間為6月25日-7月27日
- 22長(zhǎng)琿公路敦化至延吉段某隧道工程(實(shí)施)施工組織設(shè)計(jì)
- 232012年一級(jí)建造師《建設(shè)工程項(xiàng)目管理》知識(shí)點(diǎn)總結(jié):關(guān)鍵工作定義
- 242008年監(jiān)理工程師《建設(shè)工程合同管理》習(xí)題29
- 25安全工程師答疑精華:安全距離
- 262015年咨詢工程師《宏觀經(jīng)濟(jì)政策與發(fā)展規(guī)劃》每日一練(10.8)
- 272015造價(jià)員考試工程價(jià)款結(jié)算知識(shí):工程進(jìn)度款結(jié)算與支付
- 28錨桿靜壓樁在橋梁基礎(chǔ)加固中的應(yīng)用
- 29國(guó)際上的專業(yè)化項(xiàng)目管理公司受施工單位委托時(shí),主要為施工單位提供什么服務(wù)
- 30一級(jí)建造師法規(guī)及相關(guān)知識(shí)復(fù)習(xí)要點(diǎn):建設(shè)工程債
成都公司:成都市成華區(qū)建設(shè)南路160號(hào)1層9號(hào)
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓