PMP美國項(xiàng)目管理考前模擬試題
1. A narrative description of products or services to be supplied under contract is called:
a. The project plan.
B. A statement of work.
C. An exception report.
D. A Pareto analysis.
2. An example of scope verification is:
a. Reviewing the performance of an installed software module.
B. Managing changes to the project schedule.
C. Decomposing the WBS to a work package level.
D. Performing a benefit/cost analysis to determine if we should proceed with the pro
3. Which of the following is not an example of a source of scope change?
A. A variation in government regulations.
B. Failure to include a required feature in the design of a telecommunication system.
C. A need to engage in bottom-up cost estimating.
D. Introducing technology that was not available when scope was originally defined.
4. The subdivision of major project deliverables, as identified in the scope statement, into smaller, more manageable components is called:
a. Parametric estimation.
B. Scope definition.
C. Feasibility analysis.
D. Benefit-cost analysis.
5. The process of establishing clear and achievable objectives, measuring their achievement, and adjusting performance in accordance with the results of the measurement is called:
a. Strategic planning.
B. Alternative objectives inventory.
C. Management by objectives.
D. Contingency planning.
6. Configuration management is:
a. Used to ensure that the description of the project product is correct and complete.
B. The creation of the work breakdown structure.
C. The set of procedures developed to assure that project design criteria are met.
D. A mechanism to track budget and schedule variances.
7. A fundamental tenet of modern quality management holds that quality is most likely to be achieved by:
a. Planning it into the project.
B. Developing careful mechanisms to inspect for quality.
C. Striving to do the best job possible.
D. Conducting quality circle activities.
8. Your most recent project status report contains the following information: BCWP = 3,000, ACWP = 3,500, and BCWS = 4,000. The schedule variance is:
a. + 1,000.
B. + 500.
C. - 500.
D. - 1,000.
9. Learning curve theory emphasizes that in producing many goods:
a. Cost decreases as production rates increase.
B. Average unit cost decreases as more units are produced.
C. Materials become cheaper when they are purchased in bulk.
D. Laborers become more productive because of technological advances.
10. Rearranging resources so that constant resource levels are maintained is called:
a. Floating.
B. Leveling.
C. Restructuring.
D. Crashing.
- 1道路綠化工程
- 22015年注冊咨詢工程師《工程咨詢概論》練習(xí)題(65)
- 3安全工程師考試《管理知識》:普通生產(chǎn)安全事故的等級劃分
- 4鋼纖維混凝土橋面鋪裝施工
- 5建設(shè)部監(jiān)理工程師都有些什么專業(yè)
- 6梁跨中的彎矩
- 72015一級建造師考試《水利水電工程》講義(14)
- 8[襄樊市]06年安全工程師考試報(bào)名通知
- 9某住宅區(qū)室外道路工程施工組織設(shè)計(jì) 34p
- 10錨桿有哪些驗(yàn)收試驗(yàn)方法?
- 11梅州市2015年安全工程師考試報(bào)名時(shí)間為4月13日至5月14日
- 12造價(jià)工程師復(fù)習(xí)資料:民用建筑設(shè)計(jì)的評價(jià)指標(biāo)
- 13咨詢工程師2015年考試《組織與管理》習(xí)題(5)
- 14我國首例高鐵營運(yùn)線插鋪高速道岔圓滿成功
- 152015咨詢工程師考試《宏觀經(jīng)濟(jì)政策與發(fā)展規(guī)劃》試題1
- 162015招標(biāo)師《法律法規(guī)與政策》:開標(biāo)和評標(biāo)的法律規(guī)定
- 172015年監(jiān)理工程師《建設(shè)工程三大控制》練習(xí)題(48)
- 182015年監(jiān)理工程師《建設(shè)工程合同管理》練習(xí)題(32)
- 192015年招標(biāo)師招標(biāo)采購專業(yè)實(shí)務(wù)重點(diǎn)解析6
- 20景觀工程施工組織設(shè)計(jì)52p
- 21樁孔內(nèi)的作業(yè)人員要遵守的要求
- 222015年造價(jià)員基礎(chǔ)知識:塊料面層工程量
- 23《宏觀經(jīng)濟(jì)政策與發(fā)展規(guī)劃》知識點(diǎn):重點(diǎn)產(chǎn)業(yè)確定的幾種標(biāo)準(zhǔn)
- 242015注冊咨詢工程師宏觀經(jīng)濟(jì)政策與發(fā)展規(guī)劃模擬題4
- 25混凝土泵工作的幾種方式
- 262010年pmp美國項(xiàng)目管理考試項(xiàng)目成本管理練習(xí)題及答案1
- 27安全工程師生產(chǎn)管理復(fù)習(xí)要點(diǎn):風(fēng)險(xiǎn)
- 282015招標(biāo)師《項(xiàng)目管理與招標(biāo)采購》輔導(dǎo)講義(14)
- 292013年廣東二級建造師注銷注冊申請表
- 30EPS聚苯板外墻保溫施工工藝(PDF格式)
成都公司:成都市成華區(qū)建設(shè)南路160號1層9號
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓